共 50 条
- [32] The Explanatory Power of Playability Heuristics [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTER ENTERTAINMENT TECHNOLOGY (ACE 2011), 2011,
- [34] Heuristics for a Two-Stage Assembly-Type Flow Shop with Limited Waiting Time Constraints [J]. APPLIED SCIENCES-BASEL, 2021, 11 (23):
- [35] Economic optimal control with environmental constraints for combined cycle power plants [J]. IECON '98 - PROCEEDINGS OF THE 24TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, VOLS 1-4, 1998, : 640 - 645
- [36] A MODIFIED HEURISTICS FOR THE BATCH SIZE OPTIMIZATION WITH COMBINED TIME IN A MASS-CUSTOMIZED MANUFACTURING SYSTEM [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2023, 30 (05): : 1090 - 1115
- [37] Heuristics for flow shop rescheduling with mixed blocking constraints [J]. TOP, 2023, 32 (2) : 169 - 201
- [38] Heuristics for Frequency Assignment Problem with Realistic Interference Constraints [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2016, : 261 - 266
- [39] Heuristics for Job Shop Scheduling with Volatile Machine Constraints [J]. PROCEEDINGS OF 2016 IEEE ADVANCED INFORMATION MANAGEMENT, COMMUNICATES, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IMCEC 2016), 2016, : 389 - 393