Combined heuristics for synthesis of SOCs with time and power constraints

被引:6
|
作者
Mandoum, A. [1 ]
机构
[1] Ctr Dev Technol Avancees, Div Microelect & Nanotechnol, Algiers, Algeria
关键词
MAXIMIZING REWARDS; OPTIONAL CYCLES; VOLTAGES; SYSTEMS; ASSIGNMENT;
D O I
10.1016/j.compeleceng.2012.07.008
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This paper looks at the highest design level and presents a methodology for designing Systems On Chip (SOC) with low energy dissipation. The aim is achieved through a functional decomposition of the system, followed by an appropriate allocation of tasks to the different components of the system (ASICs and processors). With our approach, it is possible to generate architectures with different features (time and energy), which allows the designer to fastly obtain the architecture that best suits his application. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1687 / 1702
页数:16
相关论文
共 50 条
  • [31] Monitoring temporal logic specifications combined with time series constraints
    Drusinsky, D
    Shing, MT
    [J]. JOURNAL OF UNIVERSAL COMPUTER SCIENCE, 2003, 9 (11) : 1261 - 1276
  • [32] The Explanatory Power of Playability Heuristics
    Korhonen, Hannu
    [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTER ENTERTAINMENT TECHNOLOGY (ACE 2011), 2011,
  • [33] HEURISTICS FOR THE MINIMUM PROJECT DURATION PROBLEM WITH MINIMAL AND MAXIMAL TIME LAGS UNDER FIXED RESOURCE CONSTRAINTS
    NEUMANN, K
    ZHAN, J
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (02) : 145 - 154
  • [34] Heuristics for a Two-Stage Assembly-Type Flow Shop with Limited Waiting Time Constraints
    Han, Jun-Hee
    Lee, Ju-Yong
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (23):
  • [35] Economic optimal control with environmental constraints for combined cycle power plants
    Saez, D
    Cipriano, A
    [J]. IECON '98 - PROCEEDINGS OF THE 24TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, VOLS 1-4, 1998, : 640 - 645
  • [36] A MODIFIED HEURISTICS FOR THE BATCH SIZE OPTIMIZATION WITH COMBINED TIME IN A MASS-CUSTOMIZED MANUFACTURING SYSTEM
    Balamurugan, Arunmozhi
    Ranjitharamasamy, Sudhakara Pandian
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2023, 30 (05): : 1090 - 1115
  • [37] Heuristics for flow shop rescheduling with mixed blocking constraints
    Tighazoui, Ayoub
    Sauvey, Christophe
    Sauer, Nathalie
    [J]. TOP, 2023, 32 (2) : 169 - 201
  • [38] Heuristics for Frequency Assignment Problem with Realistic Interference Constraints
    Koo, Bon-Hong
    Yilmaz, H. Birkan
    Chae, Chan-Byoung
    Park, Hwi-Sung
    Ham, Jae-Hyun
    Park, Sung-Ho
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2016, : 261 - 266
  • [39] Heuristics for Job Shop Scheduling with Volatile Machine Constraints
    Krauss, Oliver
    Wilfing, Daniel
    Schuler, Andreas
    [J]. PROCEEDINGS OF 2016 IEEE ADVANCED INFORMATION MANAGEMENT, COMMUNICATES, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IMCEC 2016), 2016, : 389 - 393
  • [40] Implicit constraints: Heuristics applied to complex problem solving
    deVivies, X
    [J]. INTERNATIONAL JOURNAL OF PSYCHOLOGY, 1996, 31 (3-4) : 45411 - 45411