The challenges of integrated performance measurement systems Integrating mechanisms for integrated measures

被引:39
|
作者
Giovannoni, Elena [1 ]
Maraghini, Maria Pia [1 ]
机构
[1] Univ Siena, Dept Business & Law, I-53100 Siena, Italy
来源
关键词
Performance measurement; Garment industry; Small to medium-sized enterprises; Italy; Performance measurement systems; Development process; Integrating mechanisms; Integrated measures; Italian company; Creativity; MANAGEMENT CONTROL-SYSTEMS; PRODUCT DEVELOPMENT; EVOLUTION; INSIGHTS; DESIGN;
D O I
10.1108/AAAJ-04-2013-1312
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose - The purpose of this paper is to explore some of the challenges involved in the development of integrated performance measurement systems (PMS). In particular, given the difficulties involved in the development process, and the "inherent incompleteness" of PMS, the authors seek to investigate whether and how these difficulties may challenge the integrating role of PMS and the eventual influence of alternative integrating mechanisms on this role. Design/methodology/approach - The paper combines studies on PMS with empirical findings related to Monnalisa, a medium-sized Italian family firm, which designs and sells children's wear and accessories. Over the last ten years Monnalisa has adopted various design frameworks (such as the balanced scorecard and the integrated report) for integrated PMS. Through an analysis of the PMS development process within the company, the authors explore the challenges involved in this process. Findings - In the case of Monnalisa, despite the adoption of a design framework for integrated PMS, various critical issues emerged during the implementation phase, mainly as a consequence of tensions between different performance dimensions and the need for creativity. While these critical issues compromised the integrating role of PMS, alternative integrating mechanisms (such as the direct intervention of the founder and social interaction) were stimulated and worked alongside PMS in achieving organizational integration. In so doing, these mechanisms operated in different ways, by complementing incomplete PMS when they were failing to achieve organizational integration, or improving their integrated nature. Originality/value - Although the literature acknowledges some of the challenges involved in PMS development, understanding how to manage these challenges and how they actually affect PMS require further investigation. This paper provides new insights on the challenges involved in the development process (particularly in relation to the tensions caused by creativity, unpredictability, time gaps between operations and targets, as well as the distinct priorities of different levels of customers), and on the role played by alternative integrating mechanisms in the management of these challenges. While the founder's direct intervention may be peculiar to the context of medium-sized enterprises, the role played by social integrating mechanisms suggests potential ways to overcome the challenges of integrated PMS also within larger firms.
引用
收藏
页码:978 / 1008
页数:31
相关论文
共 50 条
  • [41] Towards an integrated measurement of IS project performance: The project performance scorecard
    Corlane Barclay
    Information Systems Frontiers, 2008, 10 : 331 - 345
  • [42] Towards an integrated measurement of IS project performance: The project performance scorecard
    Barclay, Corlane
    INFORMATION SYSTEMS FRONTIERS, 2008, 10 (03) : 331 - 345
  • [43] Governance and performance measurement in integrated care. An Evidence Based Integrated Care Approach
    van Kerkvoorden, Dennis Richard
    Ettema, Roelof
    Minkman, Mirella
    INTERNATIONAL JOURNAL OF INTEGRATED CARE, 2018, 18
  • [45] Hybrid Intrusion Detection Mechanisms for Integrated Electronic Systems
    Qiao, Qi
    He, Daojing
    Gao, Yun
    Zhu, Sencun
    Gao, Jiahao
    Chan, Sammy
    2020 17TH ANNUAL IEEE INTERNATIONAL CONFERENCE ON SENSING, COMMUNICATION, AND NETWORKING (SECON), 2020,
  • [46] Integrated relationships of corporate governance mechanisms and firm performance
    Lan, Xiao-Chun
    Jiang, Zhen-Huan
    INTERNATIONAL CONFERENCE ON MANAGEMENT INNOVATION, VOLS 1 AND 2, 2007, : 1181 - 1185
  • [47] Performance measurement systems - Models, characteristics and measures
    De Toni, A
    Tonchia, S
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2001, 21 (1-2) : 46 - 70
  • [48] INTEGRATED CIRCUITS + INTEGRATED SYSTEMS
    SURAN, JJ
    MAROLF, RA
    PROCEEDINGS OF THE IEEE, 1964, 52 (12) : 1661 - &
  • [49] COMPARISON OF INTEGRATED AND ISOLATED TRAINING ON PERFORMANCE MEASURES AND NEUROMUSCULAR CONTROL
    DiStefano, Lindsay J.
    DiStefano, Michael J.
    Frank, Barnett S.
    Clark, Micheal A.
    Padua, Darin A.
    JOURNAL OF STRENGTH AND CONDITIONING RESEARCH, 2013, 27 (04) : 1083 - 1090
  • [50] Implementation of Integrated Pest Management Measures in Vegetable Cropping Systems
    Ramasamy, Srinivasan
    HORTICULTURAE, 2024, 10 (11)