A new method of project cost management - Cost chain management and its implementation

被引:0
|
作者
Wang, X [1 ]
Wan, C [1 ]
机构
[1] Tianjin Univ, Sch Management, Tianjin 300072, Peoples R China
关键词
project management; cost management; supply chain; supply chain management;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
As one of the most important components of Project Management, particular emphasis of construction companies are placed on how to make the cost management more effectively. This paper introduces the thinking of SCM into cost management and defines the concept of Cost Chain Management (CCM), which describes the whole process of cost management in the whole project life cycle, and makes the Cost Management in an all-around way. But the conventional method of cost estimation and management is always based on resources and sections. Therefore the paper proposes that construction companies should determine the "target cost" of the project by using the Market Oriented Direct Cost method. Then they can put forward a competitive offer during bid phase according to this "target cost", and in construction phase they can set up cost management system by breaking down the target to each department. Finally the compositive control of cost chain is carried out. A modem cost management system based on cost chain is set up.
引用
收藏
页码:1019 / 1023
页数:5
相关论文
共 50 条
  • [1] Project Cost Estimation of the Quality Management System Implementation
    Adela-Eliza, Dumitrascu
    Serban, Nedelcu
    Badea, Lepadatescu
    [J]. LATEST TRENDS ON ENGINEERING EDUCATION, 2010, : 267 - +
  • [2] The method and its application for cost management based on value chain theory
    Yue, DM
    Wu, XD
    Qiu, FX
    Qu, Y
    Wang, YF
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 1961 - 1965
  • [3] A New Method of Cost Contingency Management
    Hammad, Mohammed Wajdi
    Abbasi, Alireza
    Ryan, Michael J.
    [J]. 2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 38 - 42
  • [4] Project management of the implementation of a cost accounting standard in Polish hospitals
    Glod, Grzegorz
    Glod, Wojciech
    [J]. EKONOMIA I PRAWO-ECONOMICS AND LAW, 2024, 23 (01): : 95 - 107
  • [5] Discussion on Construction Project Cost Composition and Its Management
    Xiao, Yang
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 27 : 390 - 393
  • [6] Research of Cost Management of Construction Project Based on Value Chain
    Wu, Yaqiong
    Luo, Fuzhou
    [J]. INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1382 - 1384
  • [7] Cost risk management of key chain in engineering construction project
    Wu, Yunna
    Mao, Chunyu
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT AND COMPUTING TECHNOLOGY, 2015, 30 : 1595 - 1600
  • [8] CONSTRUCTION PROJECT COST MANAGEMENT
    Sachek, P., V
    [J]. SCIENCE & TECHNIQUE, 2010, (05): : 72 - 78
  • [9] Management and Cost Control of Project
    Zhao, Xiuhua
    Dong, Zheng
    [J]. Ship Building of China, 2019, 60 : 503 - 507
  • [10] COST MANAGEMENT WITH IMPLEMENTATION OF DIFFERENT MANAGEMENT METHODS
    Mitacek, Michal
    [J]. HRADEC ECONOMIC DAYS, VOL 5(5), 2015, 5 : 31 - 40