Geotechnical Risk Management and Reliability Based Design-Lessons Learned

被引:0
|
作者
Becker, Dennis E. [1 ]
机构
[1] Golder Associates, 102,2535 3rd Ave SE, Calgary, AB T2A 7W5, Canada
来源
关键词
LIMIT STATES DESIGN; FOUNDATIONS;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Effective management of geotechnical risk is a requirement for successful geotechnical engineering design. The paper presents a brief overview of the development and current implementation of reliability based codes in Canada for foundations and geotechnical systems. Implementation challenges such as selection of suitable target reliability index, appropriate selection of geotechnical characteristic values, and geotechnical resistance factors for uplift resistance due to frost action are described through project examples. Lessons learned are identified and discussed. Lack of sufficient understanding of fundamental concepts, training and education are factors that contribute to the identified implementation issues. Reliability based design is not meant to be a substitute for good understanding of geology, geological processes, fundamental ground behaviour, failure mechanisms, and engineering judgement and experience. The paper demonstrates that enhanced effective risk management is obtained through close collaboration between the owner and their consultant.
引用
收藏
页码:98 / 121
页数:24
相关论文
共 50 条
  • [1] Eliciting engineering knowledge about reliability during design-lessons learnt from implementation
    Hodge, R
    Evans, M
    Marshall, J
    Quigley, J
    Walls, L
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2001, 17 (03) : 169 - 179
  • [2] Principles of vaccine design-Lessons from nature
    Zepp, Fred
    VACCINE, 2010, 28 : C14 - C24
  • [3] US Navy ship design: Lessons-learned and risk management
    Powell, KR
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 2379 - 2384
  • [4] Lessons Learned in Risk Management on NCSX
    Neilson, G. H.
    Gruber, C. O.
    Harris, J. H.
    Rej, D. J.
    Simmons, R. T.
    Strykowsky, R. L.
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2010, 38 (03) : 320 - 327
  • [5] Lessons Learned in Risk Management on NCSX
    Neilson, G. H.
    Gruber, C. O.
    Harris, J. H.
    Rej, D. J.
    Simmons, R. T.
    Strykowsky, R. L.
    2009 23RD IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 2009, : 136 - +
  • [6] Lessons (Re)learned from Geotechnical Failures
    Finno, Richard J.
    UNIVERSITY OF MINNESOTA 68TH ANNUAL GEOTECHNICAL ENGINEERING CONFERENCE (GEO-CONGRESS 2020), 2020, 321 : 14 - 28
  • [7] Mitochondria: aerobic and anaerobic design-lessons from molluscs and fishes
    Ballantyne, JS
    COMPARATIVE BIOCHEMISTRY AND PHYSIOLOGY B-BIOCHEMISTRY & MOLECULAR BIOLOGY, 2004, 139 (03): : 461 - 467
  • [8] Geotechnical Risk Management during Design and Construction
    von Rosenvinge, Theodore
    FORENSIC ENGINEERING 2022: ELEVATING FORENSIC ENGINEERING, 2022, : 511 - 516
  • [9] DESIGN AND PROJECT MANAGEMENT ROBOTICS EDUCATION: LESSONS LEARNED
    Acuna Zuniga, Ana Lourdes
    EDUCATION IN THE KNOWLEDGE SOCIETY, 2012, 13 (03): : 6 - 27
  • [10] Optimization Design of Geotechnical Engineering Based on Reliability and Lingo
    Zheng Yi
    Jia Jin-qing
    Xiong Wei-shi
    Shen Xiao-jun
    Gao Fei
    Li Li
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 975 - +