Time-based manufacturing improves business performance - results from a survey

被引:12
|
作者
Nahm, AY
Vonderembse, MA
Rao, SS
Ragu-Nathan, TS
机构
[1] Univ Wisconsin, Dept Management & Mkt, Eau Claire, WI 54702 USA
[2] Univ Toledo, Toledo, OH 43606 USA
关键词
time-based manufacturing; business environment; business performance; survey research;
D O I
10.1016/j.ijpe.2005.01.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Manufacturers face the question of how to manage and organize their operations to compete Successfully in a rapidly changing external environment. To examine this question, data from 224 manufacturers were collected and divided along two dimensions: (1) levels of time based manufacturing practices and (2) stable versus turbulent external environments. Results indicate that firms with high levels of time-based manufacturing practices have higher performance regardless of the external environment. When time-based manufacturing practices are examined individually, the results indicate that high-performing firms operating in turbulent markets emphasize different time-based practices than high-performing firms operating in stable markets. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:213 / 229
页数:17
相关论文
共 50 条
  • [31] Time-Based Roofline for Deep Learning Performance Analysis
    Wang, Yunsong
    Yang, Charlene
    Farrell, Steven
    Zhang, Yan
    Kurth, Thorsten
    Williams, Samuel
    PROCEEDINGS OF 2020 IEEE/ACM 5TH WORKSHOP ON DEEP LEARNING ON SUPERCOMPUTERS (DLS 2020), 2020, : 10 - 19
  • [32] Reliability evaluation for time-based stochastic manufacturing networks with time-dependent reliability
    Chang, Ping-Chen
    Huang, Cheng-Fu
    Fiondella, Lance
    QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2024, 21 (06): : 1025 - 1041
  • [33] From time-based competition (TBC) to quick response manufacturing (QRM): the evolution of research aimed at lead time reduction
    Godinho Filho, Moacir
    Saes, Elizangela Veloso
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8): : 1177 - 1191
  • [34] Time Scorecard: An integrative Performance Measurement Framework For Time-based Companies
    Cui Song
    Zhang Hong
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 9605 - 9609
  • [35] From time-based competition (TBC) to quick response manufacturing (QRM): the evolution of research aimed at lead time reduction
    Moacir Godinho Filho
    Elizangela Veloso Saes
    The International Journal of Advanced Manufacturing Technology, 2013, 64 : 1177 - 1191
  • [36] Is past performance a guarantee for current results? The influence of learning on business performance in manufacturing
    Prim, Alexandre Luis
    de Freitas, Kenyth Alves
    Paiva, Ely
    Kumar, Maneesh
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2024, 35 (01) : 164 - 184
  • [37] A Comprehensive Overview of Additive Manufacturing Processes Through a Time-Based Classification Model
    Koltsaki, Maria
    Mavri, Maria
    3D PRINTING AND ADDITIVE MANUFACTURING, 2024, 11 (01) : 363 - 382
  • [38] TIME-BASED MACHINE FAILURE PREDICTION IN MULTI-MACHINE MANUFACTURING SYSTEMS
    Sobaszek, Lukasz
    Gola, Arkadiusz
    Swic, Antoni
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2020, 22 (01): : 52 - 62
  • [39] Impact of operations management practices on quality and time-based performance
    Jayaram, J.
    Ahire, S.
    International Journal of Quality & Reliability Management, 15 (2-3):
  • [40] Impact of ISO 9000 on Time-based Performance: An Event Study
    Lo, Chris K. Y.
    Yeung, Andy C. L.
    Cheng, T. C. Edwin
    PROCEEDINGS OF WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY, VOL 24, 2007, 24 : 35 - 40