共 50 条
- [23] Two-agent single-machine scheduling with release dates to minimize the makespan Optimization Letters, 2023, 17 : 1915 - 1937
- [24] Some two-agent single-machine scheduling problems to minimize minmax and minsum of completion times Operational Research, 2018, 18 : 293 - 314
- [25] Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem Operational Research, 2022, 22 : 1403 - 1442
- [30] Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan PROCEEDINGS OF 2013 6TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING (ICIII 2013) VOL 1, 2013, : 487 - 489