Study on Site Construction Technology of Four-graded RCC

被引:6
|
作者
Lin Yuqiang [1 ]
Shi Yan [1 ]
Guo Dingming [2 ]
Li Jiazheng [1 ]
Yang Huaquan [1 ]
机构
[1] Changjiang Water Resources Commiss, Changjiang River Sci Res Inst, Wuhan 430010, Peoples R China
[2] Shatuo HydroPower Construct Co, Guizhou Wujiang HydroPower Dev Ltd, Guizhou 565300, Peoples R China
来源
ADVANCED BUILDING MATERIALS, PTS 1-4 | 2011年 / 250-253卷 / 1-4期
关键词
four-graded RCC (roller compacted concrete); construction technology; rolling times; relative compaction;
D O I
10.4028/www.scientific.net/AMR.250-253.2927
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Tests on rolling technology of four-graded RCC were carried out on dam site and then recommended construction parameters of four-graded RCC was proposed, which aimed to provide technique support for application of four-graded RCC in hydropower projects. Results show that when water consumption is 71kg/m(3) and VC value is 3s similar to 5s of four-graded RCC, large aggregates are coated with mortar sufficiently and the mixture has good performance of being-rolled and anti-separation. Recommended parameters of four-graded RCC are as follows: 2 times without vibration+6 times with vibration+2 times without vibration for 0.4m-thick layer, 2 times without vibration+8 times with vibration +2 times without vibration for 0.5m-thick layer, with rolling exciting force 395kN and walking speed 1.0 similar to 1.5km/h. Then the relative compaction of four-graded RCC can reach or exceed 98.0%.
引用
收藏
页码:2927 / +
页数:2
相关论文
共 50 条
  • [21] Smarter construction site management using the latest information technology
    Yu, Zhenbao
    Peng, Hongtao
    Zeng, Xianyi
    Sofi, Massoud
    Xing, Hui
    Zhou, Zhiyuan
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (02) : 89 - 95
  • [22] Process Need Areas and Technology Adoption in Construction Site Management
    Ozumba, Aghaegbuna Obinna
    Ojiako, Udechukwu
    Shakantu, Winston
    Marshall, Alasdair
    Chipulu, Maxwell
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2019, 24 (02) : 123 - 155
  • [23] On-site construction management using mobile computing technology
    Kim, Changyoon
    Park, Taeil
    Lim, Hyunsu
    Kim, Hyoungkwan
    AUTOMATION IN CONSTRUCTION, 2013, 35 : 415 - 423
  • [24] Construction Technology of Off-Site Precast Concrete Buildings
    Gong, Ting
    Yang, Jian
    Hu, Hao
    Xu, Feng
    FRONTIERS OF ENGINEERING MANAGEMENT, 2015, 2 (02) : 122 - 124
  • [25] Construction Technology of Off-Site Precast Concrete Buildings
    Ting Gong
    Jian Yang
    Hao Hu
    Feng Xu
    Frontiers of Engineering Management, 2015, 2 (02) : 122 - 124
  • [26] IMPACT OF CONSTRUCTION WASTE MINIMIZATION AT CONSTRUCTION SITE: CASE STUDY
    Umar, Usman Aminu
    Shafiq, Nasir
    Malakahmad, Amirhossein
    Nuruddin, Muhd Fadhil
    Khamidi, Mohd Faris
    Salihi, Ibrahim Umar
    JURNAL TEKNOLOGI, 2016, 78 (5-3): : 33 - 40
  • [27] Study on the Maturity of Construction Technology in China
    Ke, Yanyan
    Qiu, Yimin
    Yang, Zhengyu
    2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632
  • [28] Study on Strategy of Construction Technology Standardization
    Zhao Xueling
    Sun Jie
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 638 - +
  • [29] Study on Strategy of Construction Technology Standardization
    Zhao, Xue-ling
    ICVE&VM 2009: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON VALUE ENGINEERING AND VALUE MANAGEMENT, 2009, : 625 - 630
  • [30] Study on construction technology of phosphogypsum wall
    Zhang, Yichao
    Wang, Ying
    Zhou, Jinghai
    2018 4TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION, 2019, 252