Controlling the risk of sinkholes over EPB driven tunnels - a client perspective

被引:0
|
作者
Shirlaw, J. N. [1 ]
Boone, S. J. [1 ]
Sugden, N. B. [2 ]
Peach, A. [3 ]
机构
[1] Golder Associates, Mississauga, ON, Canada
[2] Land Transport Author, Singapore, Singapore
[3] Terratec, Hobart, Tas, Australia
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The occurrence of occasional sinkholes or very large settlements over EPB driven tunnels has been documented on a number of projects. Primary responsibility for avoiding sinkholes must lie with the tunnelling contractor, and the shield manufacturer. Almost all of the documented cases can be ascribed directly to failures in the planning, procedures, operation and maintenance of the machine, or to the design of the machine. However, the client has a major stake in controlling this risk. Sinkholes in urban areas are likely to lead to damage to roads and utilities, may damage buildings, and pose a risk to the public. It is current experience that simply appointing an experienced tunnelling contractor and requiring experienced operators are inadequate to control the risk of sinkholes occurring. A client can help to control the risk by providing sufficient site investigation, developing specifications that set minimum standards, and appointing experienced site supervision teams.
引用
收藏
页码:439 / +
页数:2
相关论文
共 50 条
  • [21] DATA-DRIVEN PERSONALIZED CERVICAL CANCER RISK PREDICTION: A GRAPH-PERSPECTIVE
    Gogineni, Vinay Chakravarthi
    Langberg, Severin R. E.
    Naumova, Valeriya
    Nygard, Jan F.
    Nygard, Mari
    Grasmair, Markus
    Werner, Stefan
    2021 IEEE STATISTICAL SIGNAL PROCESSING WORKSHOP (SSP), 2021, : 46 - 50
  • [22] Manufacturing planning and control driven supply chain risk management: A dynamic capability perspective
    Rehman, Attique Ur
    Jajja, Muhammad Shakeel Sadiq
    Farooq, Sami
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2022, 167
  • [23] A new perspective on modeling groundwater contaminant-driven health risk with subjective information
    Ozbek, MM
    Pinder, GF
    COMPUTATIONAL METHODS IN WATER RESOURCES, VOLS 1 AND 2, 2004, 55 : 1227 - 1239
  • [24] A stochastic control perspective on term structure models with roll-over risk
    Fontana, Claudio
    Pavarana, Simone
    Runggaldier, Wolfgang J.
    FINANCE AND STOCHASTICS, 2023, 27 (04) : 903 - 932
  • [25] A stochastic control perspective on term structure models with roll-over risk
    Claudio Fontana
    Simone Pavarana
    Wolfgang J. Runggaldier
    Finance and Stochastics, 2023, 27 : 903 - 932
  • [26] Do non-controlling large shareholders affect corporate over-financialization?: A shareholder hybrid perspective
    Li, Bingxiang
    Zhang, Dan
    MANAGERIAL AND DECISION ECONOMICS, 2023,
  • [27] Risk-Driven Aggregation and Transmission Prioritization of Cyber Alerts over Mobile Networks
    Cam, Hasan
    Monallem, Pierre
    2014 INTERNATIONAL CONFERENCE ON COMPUTING, NETWORKING AND COMMUNICATIONS (ICNC), 2014, : 58 - 62
  • [28] Machine Learning-Driven Model to Analyze Particular Conditions of Contracts: A Multifunctional and Risk Perspective
    Yang, Jianxiong
    Chen, Yongqiang
    Yao, Hongjiang
    Zhang, Bingxin
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (05)
  • [29] Assessment of Regional Drought Trend and Risk over China: A Drought Climate Division Perspective
    Li, Xiuzhen
    Zhou, Wen
    Chen, Yongqin David
    JOURNAL OF CLIMATE, 2015, 28 (18) : 7025 - 7037
  • [30] A qualitative, patient-centered perspective toward plasma products supply chain network design with risk controlling
    Hosseini-Motlagh, Seyyed-Mahdi
    Larimi, Niloofar Gilani
    Nejad, Maryam Oveysi
    OPERATIONAL RESEARCH, 2022, 22 (01) : 779 - 824