Simulation-based scheduling of multi-stage production processes in a steel mill using fuzzy logic for sequencing

被引:0
|
作者
Hellingrath, B [1 ]
Hoenen, M [1 ]
Mazzocco, C [1 ]
机构
[1] Fraunhofer Inst Mat Flow & Logist, IML, D-44227 Dortmund, Germany
关键词
scheduling; optimisation; AI in simulation;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The co-ordination of multi-stage production processes with technical constraints is a highly complex task. The optimisation of counteracting goals, e.g. the harmonisation of the inventory in the different production stages as well as the fulfilment of technical constraints of single machines, can not be managed manually. Knowledge-based systems offer an efficient technology for supporting production planning. optimisation harmonisation At Fraunhofer IML a scheduling system for a steel mill based on simulation and fuzzy logic was developed. This system is successfully used utilising large rationalisation potentials.
引用
收藏
页码:427 / 432
页数:6
相关论文
共 50 条
  • [1] Application of simulation and fuzzy logic for the optimisation of multi-stage production processes in a steel mill
    Hellingrath, B
    Hoenen, M
    Mazzocco, C
    PROGRESS IN CONNECTIONIST-BASED INFORMATION SYSTEMS, VOLS 1 AND 2, 1998, : 1255 - 1258
  • [2] Multi-stage production system: modelling and analysis using simulation
    Gunasekaran, A
    Goyal, SK
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 1999, 12 (2-5) : 119 - 130
  • [3] Analysis of performance of fuzzy logic-based production scheduling by simulation
    Duenas, A
    Petrovic, D
    Petrovic, S
    MICAI 2005: ADVANCES IN ARTIFICIAL INTELLIGENCE, 2005, 3789 : 234 - 243
  • [4] Autonomous decentralized scheduling system for multi-stage parallel-unit production processes
    Kitajima, T
    Nishitani, H
    Saitoh, A
    Hasebe, S
    Hashimoto, I
    KAGAKU KOGAKU RONBUNSHU, 1996, 22 (05) : 1031 - 1038
  • [5] SIMULATION-BASED OPTIMIZATION OF MULTI-STAGE SUPPLY CHAIN SYSTEM USING SYSTEM DYNAMICS AND MATLAB PROGRAM
    Wang, Hongsen
    Jia, Suling
    Yan, Zhihua
    ICIM2014: PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2014, : 90 - 96
  • [6] Multi-cyclic flow shop scheduling: an application in multi-stage, multi-product production processes
    ElNajdawi, MK
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (12) : 3323 - 3332
  • [7] Intelligent control of a direct-drive robot using multi-stage fuzzy logic
    Adams, JM
    Rattan, KS
    PROCEEDINGS OF THE 44TH IEEE 2001 MIDWEST SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOLS 1 AND 2, 2001, : 543 - 546
  • [8] Simulation-based optimization strategy for liquid fueled multi-stage space launch vehicle
    Akhtar, S
    He, LS
    PDCAT 2005: Sixth International Conference on Parallel and Distributed Computing, Applications and Technologies, Proceedings, 2005, : 359 - 364
  • [9] Simulation-based Prediction Model of the Auto-body Multi-Stage Forming Process
    Han, Dong-Guk
    Jung, Dong-Won
    PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INDUSTRIAL ENGINEERING (AIIE 2016), 2016, 133 : 69 - 72
  • [10] Production/maintenance cooperative scheduling using multi-agents and fuzzy logic
    Coudert, T
    Grabot, B
    Archimède, B
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (18) : 4611 - 4632