Study On Numerical Simulation of the Arrangement about Mining Roadway with Short Distance

被引:0
|
作者
Yan Guochao [1 ]
Ma Zhonghui [2 ]
Hu Yaoqing [1 ]
机构
[1] Taiyuan Univ Technol, Taiyuan, Peoples R China
[2] Shenhua Grp Corp Ltd, Beijing, Peoples R China
来源
ISMSSE 2011 | 2011年 / 26卷
关键词
short distance; mining roadway; numerical simulation; staggered distance;
D O I
10.1016/j.proeng.2011.11.2172
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Based on numerical simulation test and test results, the stability of bare roadway with different staggered distance was studied. Conclusions can be drew as follows: Of these ulter-closed mining roadway arrangement modes, global stability of the inboard type roadway is better based on the aspects of degree of damage; Roof subsidence in the inboard-type roadway is smaller, offset at two sides of roadway is larger, its offset direction approaches toward the centre of roadway, and offset increases with staggered distance decreases, the supporting of two sides is the central difficulty for in-board type roadway; The degree of damage in overlapping-type roadway is larger, and roof subsidence of overlapping-type is similar with the inboard-type roadway, while the deformation is large at left side, there are few changes at right side. The destructive deformation is maximum when the staggered distance of outward-type roadway is 2m, and degree of damage is decreases with the increase of staggered distance in outward-type roadway. Overall, roof subsidence in the outward-type roadway is larger, and two sides of it are basically stable. (C) 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of China Academy of Safety Science and Technology, China University of Mining and Technology(Beijing), McGill University and University of Wollongong.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Numerical simulation for constructions of metro tunnels with short distance between them
    Bi Ji-hong
    Jiang Zhi-feng
    Chang Bin
    ROCK AND SOIL MECHANICS, 2005, 26 (02) : 277 - 281
  • [22] NUMERICAL SIMULATION OF SUBSIDENCE CAUSED BY ROADWAY SYSTEM
    Polanin, Piotr
    Kowalski, Andrzej
    Walentek, Andrzej
    ARCHIVES OF MINING SCIENCES, 2019, 64 (02) : 385 - 397
  • [23] Numerical Study on Stress Relief and Fracture Distribution Law of Floor in Short-Distance Coal Seams Mining: A Case Study
    Chunlei Zhang
    Ruimin Feng
    Xibin Zhang
    Wei Shen
    Geotechnical and Geological Engineering, 2021, 39 : 437 - 450
  • [24] Numerical Study on Stress Relief and Fracture Distribution Law of Floor in Short-Distance Coal Seams Mining: A Case Study
    Zhang, Chunlei
    Feng, Ruimin
    Zhang, Xibin
    Shen, Wei
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (01) : 437 - 450
  • [25] Case Study of Roadway Deformation Failure Mechanisms: Field Investigation and Numerical Simulation
    Li, Guang
    Ma, Fengshan
    Guo, Jie
    Zhao, Haijun
    ENERGIES, 2021, 14 (04)
  • [26] Numerical Simulation Study and Engineering Validation based on Coal Seam Roadway Excavation
    Jin Yan
    Minbo Zhang
    Ziyi Zhong
    Mengzhen Du
    Zichao Wang
    Solid Fuel Chemistry, 2025, 59 (2) : 111 - 126
  • [27] Instability Mechanism and Surrounding Rock Control Technology of Roadway Subjected to Mining Dynamic Loading with Short Distance: A Case Study of the Gubei Coal Mine in China
    Weijing Yao
    Guangcheng Liu
    Jianyong Pang
    Xin Huang
    Geotechnical and Geological Engineering, 2023, 41 : 1407 - 1427
  • [28] Instability Mechanism and Surrounding Rock Control Technology of Roadway Subjected to Mining Dynamic Loading with Short Distance: A Case Study of the Gubei Coal Mine in China
    Yao, Weijing
    Liu, Guangcheng
    Pang, Jianyong
    Huang, Xin
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (02) : 1407 - 1427
  • [29] Numerical simulation about fracture development in overlying rocks under repeated mining
    Yao, Bang-Hua
    Zhou, Hai-Feng
    Chen, Long
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2010, 27 (03): : 443 - 446
  • [30] Optimization of staggered distance of coal pillars in multiseam mining: Theoretical analysis and numerical simulation
    Sun, Xueyang
    Lu, Mingjiao
    Li, Cheng
    ENERGY SCIENCE & ENGINEERING, 2021, 9 (03) : 357 - 374