共 50 条
- [21] Agile Project Planning Framework and Method for Allocating Limited Crews to Drainage Construction Projects COMPUTING IN CIVIL ENGINEERING 2023-RESILIENCE, SAFETY, AND SUSTAINABILITY, 2024, : 841 - 848
- [25] Network Planning Analysis on Road Construction Projects by CV. X Using Evaluation Review Technique (PERT) - Critical Path Method (CPM) and Crashing Method INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2022, 14 (04): : 377 - 390
- [26] Urban planning in areas impacted by Large Investment Projects (LIPs): an analysis of the State of Rondonia URBE-REVISTA BRASILEIRA DE GESTAO URBANA, 2019, 11
- [27] PC-BASED GIS FRAMEWORK FOR THE MANAGEMENT AND ANALYSIS OF HAZARDOUS-WASTE SITE REMEDIATION PROJECTS PAPERS FROM THE 1989 ANNUAL CONFERENCE OF THE URBAN AND REGIONAL INFORMATION SYSTEMS ASSOCIATION, VOL 4, 1989, : 358 - 366
- [28] Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis TEKNIK DERGI, 2019, 30 (02): : 8937 - 8959
- [30] From the inventory to the risk analysis: Improvements to a large scale GIS method LANDSLIDES - PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE AND FIELD TRIP ON LANDSLIDES, 1996, : 335 - 342