BIM-based Sustainable Building Design Process and Decision-making

被引:0
|
作者
Lim, Yaik-Wah [1 ]
机构
[1] UTM, Inst Smart Infrastruct & Innovat Construct, Ctr Study Built Environm Malay World KALAM, Johor Baharu, Malaysia
关键词
Green BIM; Level of Development; Revit; Decision-making framework; BIM functionalities; INFORMATION MODELING BIM; FRAMEWORK;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Sustainability is a major concern in the building industry due to the climate change and depletion of energy sources. Nevertheless, the current process of sustainable building design depends on various disjointed analyses to meet the different required sustainability performances. Building information modeling (BIM) allows for complex buildings being digitally modeled with accurate geometry and information for sustainable design process and decision-making during the early design stages. Therefore, the aim of this study is to integrate BIM with sustainable building design decision-making by considering the tropical climatic contexts in Malaysia. A BIM-based decision-making framework (DMF) was developed based on review on related literature and green building certifications as well as BIM tools evaluation. The proposed DMF supports design decision-making at multiple BIM Level of Development (LOD). Based on the framework, Revit template was developed to extract BIM data for decision-making. The research output deals with the challenges of decision-making in the early building design process by allowing for specific sustainability performance analyses.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Sustainable Building Adaptation: Innovations in Decision-making
    Olander, Stefan
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (09) : 777 - +
  • [22] DESIGN IN THE DECISION-MAKING PROCESS
    ALEXANDER, ER
    [J]. POLICY SCIENCES, 1982, 14 (03) : 279 - 292
  • [23] BIM-Based Integrated Design Approach for Low Carbon Green Building Optimization and Sustainable Construction
    Gan, Vincent J. L.
    Lo, Irene M. C.
    Tse, K. T.
    Wong, C. L.
    Cheng, Jack C. P.
    Chan, C. M.
    [J]. COMPUTING IN CIVIL ENGINEERING 2019: VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2019, : 417 - 424
  • [24] Decision-making in process design based on failure knowledge
    Dai, Wei
    Yang, Jun
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 1505 - 1509
  • [25] Sustainable Building Design Based on BIM
    Zhu, Sitan
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1746 - 1750
  • [26] Decision-making in a model-based design process
    Schade, Jutta
    Olofsson, Thomas
    Schreyer, Marcus
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (04) : 371 - 382
  • [27] The BIM-Based Building Permit Process: Factors Affecting Adoption
    Ullah, Kaleem
    Witt, Emlyn
    Lill, Irene
    [J]. BUILDINGS, 2022, 12 (01)
  • [28] BIM-based assessment of sustainable maintenance measures for existing building structures
    Jaekel, Jan-Iwo
    Morgenstern, Hendrik
    Kloesgen, Linus
    Koenig, Timothy
    Klemt-Albert, Katharina
    Raupach, Michael
    [J]. BAUTECHNIK, 2024, 101 (08) : 431 - 441
  • [29] DEVELOPMENT OF THE INTEGRATED MANAGEMENT ENVIRONMENT OF BIM PROPERTY FOR BIM-BASED SUSTAINABLE DESIGN
    Shin, Jihye
    Kim, Inhan
    Choi, Jungsik
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON COMPUTER-AIDED ARCHITECTURAL DESIGN RESEARCH IN ASIA (CAADRIA 2016): LIVING SYSTEMS AND MICRO-UTOPIAS: TOWARDS CONTINUOUS DESIGNING, 2016, : 487 - 496
  • [30] IMPACT OF ORGANIZATIONAL FACTORS ON DELAYS IN BIM-BASED COORDINATION FROM A DECISION-MAKING VIEW: A CASE STUDY
    Jang, Sejun
    Lee, Ghang
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2018, 24 (01) : 19 - 30