scheduling;
parallel machines;
lot sizing;
setup times;
shared resources;
stochastic production rates;
SEQUENCE-DEPENDENT SETUP;
UP CARRYOVER;
MODELS;
FORMULATIONS;
HEURISTICS;
ALGORITHMS;
RESOURCES;
COSTS;
TIMES;
CLSP;
D O I:
10.1080/00207543.2019.1600763
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
We develop a solution procedure for a production problem that involves the optimal lot-sizing and scheduling of multiple products on parallel machines over a long planning horizon. The objective is to determine the product assignment, production quantities, and production sequence on each machine in order to meet demand and maximise the total production amount in a given planning horizon. We study this problem in the context of the manufacturing of pipe insulation, in which multiple features have to be considered simultaneously. The solution procedure combines mathematical programming and a post-processing sequencing heuristic. We also develop a procedure to determine safety stock levels and use Monte Carlo simulation to assess the risk associated with inventory shortages due to stochastic production rates. Computational tests are performed on both real and artificially-generated data.
机构:
Chinese Univ Hong Kong, Dept Syst Engn & Engn Management, Shatin, Hong Kong, Peoples R ChinaChinese Univ Hong Kong, Dept Syst Engn & Engn Management, Shatin, Hong Kong, Peoples R China
Cheng, CH
Madan, MS
论文数: 0引用数: 0
h-index: 0
机构:Chinese Univ Hong Kong, Dept Syst Engn & Engn Management, Shatin, Hong Kong, Peoples R China
Madan, MS
Gupta, Y
论文数: 0引用数: 0
h-index: 0
机构:Chinese Univ Hong Kong, Dept Syst Engn & Engn Management, Shatin, Hong Kong, Peoples R China
Gupta, Y
So, S
论文数: 0引用数: 0
h-index: 0
机构:Chinese Univ Hong Kong, Dept Syst Engn & Engn Management, Shatin, Hong Kong, Peoples R China