Identification and classification of change causes and effects in construction projects

被引:11
|
作者
Padala, S. P. Sreenivas [1 ]
Maheswari, J. Uma [1 ]
Hirani, Harish [2 ]
机构
[1] Indian Inst Technol Delhi, Dept Civil Engn, New Delhi, India
[2] Indian Inst Technol Delhi, Dept Mech Engn, New Delhi, India
关键词
Change; change cause; change effect; change management; delays; cost overruns; IMPROVING DESIGN COORDINATION; CHANGE ORDERS; CHANGE MANAGEMENT; BUILDING-PROJECTS; COST; IMPACT; REWORK; MODEL; QUALITY; SCHEDULE;
D O I
10.1080/15623599.2020.1827186
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Managing changes has become a critical issue in the construction industry in recent years. Changes are inevitable throughout the lifecycle of the construction project. Understanding change causes and effects can support project teams to manage changes proactively. Although various research articles are published in this field, a comprehensive and systematic overview of change causes and effects is missing due to different terminologies and perspectives, lack of distinction between generic and project-specific causes, and lack of validation with industry experts. Therefore, the objective of this study is to identify and classify change causes and effects in construction projects. A multi-case study research method is utilised to achieve the objective of the study. The study provides two contributions to the body of knowledge of change management. First, a comprehensive list of 85 change causes and 45 change effects which are identified from the literature and multi-case study are presented. Around 3951 changes from 19 construction projects are investigated to identify causes and effects. Second, a taxonomy is proposed to classify change causes and effects. The proposed taxonomy consists of three levels with an increasing level of detail of the change cause and effect and it can support project teams to develop strategies to eliminate or minimise changes in the construction project.
引用
收藏
页码:2788 / 2807
页数:20
相关论文
共 50 条
  • [41] Causes of schedule delays in construction projects in Algeria
    Rachid, Zemra
    Toufik, Boudouh
    Mohammed, Baheddi
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) : 371 - 381
  • [42] Causes of delay in Saudi public construction projects
    Alsuliman, Jawad A.
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (02) : 801 - 808
  • [43] Understanding Causes for Construction Claims in Hydropower Projects
    Liao, Longhui
    Wei, Nana
    Zheng, Chuchu
    Ye, Yuehua
    Chen, Yun
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (05)
  • [44] Causes of delays on construction projects: a comprehensive list
    Durdyev, Serdar
    Hosseini, M. Reza
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 20 - 46
  • [45] Development of a Taxonomy for Causes of Changes in Construction Projects
    Birgonul, Zeynep
    Budayan, Cenk
    Koc, Kerim
    [J]. BUILDINGS, 2024, 14 (01)
  • [46] Causes of Delay in Building Construction Projects in Egypt
    El-Razek, M. E. Abd
    Bassioni, H. A.
    Mobarak, A. M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 831 - 841
  • [47] Causes of Construction Projects Cost Overrun in Brazil
    Franca, Alda
    Haddad, Assed
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2018, 9 (01): : 69 - 83
  • [48] Causes of Construction Delay for Housing Projects in Malaysia
    Ramli, M. Z.
    Nordin, A.
    Roslin, N. T.
    Hamid, N. B.
    Azman, N. S.
    Zahari, N. M.
    [J]. 5TH INTERNATIONAL CONFERENCE ON GREEN DESIGN AND MANUFACTURE 2019 (ICONGDM 2019), 2019, 2129
  • [49] Causes of Time Waste in Construction Projects in Palestine
    Enshassi, Adnan
    El-Moghany, Said
    Mayer, Peter E.
    Zimmermann, Josef
    [J]. ARAB GULF JOURNAL OF SCIENTIFIC RESEARCH, 2010, 28 (01): : 13 - 28
  • [50] Causes of delay in road construction projects in Malawi
    Kamanga, M. J.
    Steyn, W. J. von der M.
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTION OF CIVIL ENGINEERING, 2013, 55 (03) : 79 - 85