共 50 条
- [23] A HYBRID ALGORITHM TO MINIMIZE THE NUMBER OF TARDY JOBS IN SINGLE MACHINE SCHEDULING [J]. ANNALS OF DAAAM FOR 2008 & PROCEEDINGS OF THE 19TH INTERNATIONAL DAAAM SYMPOSIUM, 2008, : 69 - 70
- [24] Integrating Simulation and Optimization for Process Planning and Scheduling Problems [J]. 29TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2019, 46 : 1441 - 1446
- [26] A blackboard architecture for integrating process planning and production scheduling [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1998, 6 (02): : 88 - 100
- [28] No-wait flowshop scheduling problem to minimize the number of tardy jobs [J]. The International Journal of Advanced Manufacturing Technology, 2012, 61 : 311 - 323
- [29] No-wait flowshop scheduling problem to minimize the number of tardy jobs [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4): : 311 - 323
- [30] Stochastic Single Machine Scheduling to Minimize the Weighted Number of Tardy Jobs [J]. FUZZY INFORMATION AND ENGINEERING 2010, VOL 1, 2010, 78 : 363 - +