Approximation algorithm for multiprocessor parallel job scheduling

被引:4
|
作者
Chen, SQ [1 ]
Huang, JG [1 ]
Chen, JE [1 ]
机构
[1] Cent S Univ, Coll Informat Engn, Changsha 410083, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
multiprocessor parallel job; scheduling; approximation algorithm; NP-hard problem;
D O I
10.1007/s11771-002-0040-0
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
P-k \fix\ C-max problem is a new scheduling problem based on the multiprocessor parallel job, and it is proved to be NP-hard problem when k greater than or equal to 3. This paper focuses on the case of k = 3. Some new observations and new techniques for P-3 \fix\ C-max problem are offered. The concept of semi-normal schedulings is introduced, and a very simple linear time algorithm Semi-normal Algorithm for constructing semi-normal schedulings is developed. With the method of the classical Graham List Scheduling, a thorough analysis of the optimal scheduling on a special instance is provided, which shows that the algorithm is an approximation algorithm of ratio of 9/8 for any instance of P-3 \fix\ C-max problem, and improves the previous best ratio of 7/6 by M. X. Goemans.
引用
收藏
页码:267 / 272
页数:6
相关论文
共 50 条