WOMAD - the use of NEC-EEC (New Engineering Contract - Engineering Construction Contract) on a major decommissioning contract

被引:0
|
作者
Parkinson, SJ [1 ]
Gregson, KP [1 ]
Staples, A [1 ]
机构
[1] NUKEM Nucl Ltd, Winfrith, England
来源
NUCLEAR DECOM 2001: ENSURING SAFE, SECURE, AND SUCCESSFUL DECOMMISSIONING | 2001年 / 2001卷 / 08期
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
WOMAD (Winfrith Operations Maintenance and Decommissioning) is a major restoration project at the UKAEA's Winfrith site. NUKEM Nuclear Ltd (NUKEM) was awarded the implementation contract in March 2000. The contract value is approximately pound30M with a duration of 8.5 years. Briefly the WOMAD contract comprises: Further operation, decommissioning and finally demolition of the A59 Active Handling and Decontamination Facility. Taking over the care and maintenance and decommissioning of various other facilities on site including the SGHWR (Steam Generating Heavy Water Reactor), ZEBRA (Zero Energy Breeder Reactor) and Dragon. Retrieval and processing of active sludge from the SGHWR's sludge tanks. The contract awarded to NUKEM is based on a functional specification and NEC - ECC (Option A Fixed Price with activity schedule) Contract. This approach allowed both UKAEA and NUKEM to have a clear understanding of the project deliverables and a proper apportionment of risk whilst using a recognised standard set of contract conditions. These conditions have clear remedies and obligations, which should both assist with the management of the difficulties, which often beset decommissioning contracts. This paper sets out to describe the process from tender inception to the completion of the first year of the Project.
引用
收藏
页码:223 / 232
页数:10
相关论文
共 50 条
  • [41] Fives FCB signs new contract with Imsat Ceprocim Engineering
    不详
    ZKG INTERNATIONAL, 2013, 66 (02): : 10 - 10
  • [42] The challenges of adopting new engineering contract: a Hong Kong study
    Lau, Chung Him
    Mesthrige, Jayantha Wadu
    Lam, Patrick T. I.
    Javed, Arshad Ali
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (10) : 2389 - 2409
  • [43] Briefing: Time-bar provisions of NEC3 Engineering and Construction Contract clause W1.3
    Davis, Terrence
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2019, 172 (01) : 3 - 4
  • [44] Contract management in the engineering projects of integrated management
    Santalla Rodriguez, Laura Maria
    Delgado Victore, Roberto
    Mendez Perez, Rosa Maria
    Espinosa Gronzo, Alicia
    Blanco Gonzalez, Jefrey
    DILEMAS CONTEMPORANEOS-EDUCACION POLITICA Y VALORES, 2018, 5 (03):
  • [45] Toyo Engineering gets China urea contract
    不详
    CHEMICAL WEEK, 1997, 159 (38) : 30 - 30
  • [46] Engineering - Jacobs wins BASF Geismar contract
    不详
    EUROPEAN CHEMICAL NEWS, 1998, 69 (1818): : 34 - 34
  • [47] Raytheon wins engineering services contract for ROTHR
    Glassborow, Katy
    Jane's Navy International, 2005, (OCT.):
  • [48] CONSIDERATIONS IN MAKING ENGINEERING-CONTRACT ARRANGEMENTS
    THAYER, KB
    MECHANICAL ENGINEERING, 1980, 102 (07) : 69 - 69
  • [49] Defining Construction: Can a Contract for "Non-physical" Works Be a Construction Contract in New Zealand?
    Campbell, Shane
    Halligan, Jordan
    AUSTRALASIAN DISPUTE RESOLUTION JOURNAL, 2022, 32 (01): : 57 - 67
  • [50] ENGINEERING AND THE LAW .2. CONTRACT LIABILITY
    WALTER, C
    IEEE ENGINEERING IN MEDICINE AND BIOLOGY MAGAZINE, 1986, 5 (03): : 78 - 79