Power Transformer Risk Index Assessment for an Asset Management Plan

被引:0
|
作者
Medina, R. D. [1 ]
Morales, D. X. [2 ]
Toledo, M. A. [3 ]
Cabrera, J. B. [2 ]
机构
[1] Univ Nacl San Juan, Inst Energia Elect, San Juan, Argentina
[2] Univ Catolica Cuenca, Grp Invest Redes Elect Inteligentes, Cuenca, Ecuador
[3] Empresa Elect Reg Ctr, Cuenca, Ecuador
关键词
Final failure; oil test; power transformer; risk index assessment;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a method for assess the risk index in a power transformers park, risk index is a metric that allows park administrator to ensure an optimal physical asset management, allocating properly financial and human resources in operation and maintenance actions. Assessing risk index requires calculating two secondary sub-index termed failure probability and consequence factor. Those indexes are integrated into the risk index value. In order to illustrate this process, 16 units risk index is evaluated, those units operates in the national Ecuadorian electric grid, results and discussion are finally presented.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] Stepping Up to the Future With Power Transformers: Power Transformer Asset Management Strategies: State of the Art and Recommendations for the Future
    Roychowdhury, Rajarshi
    Wu, Xuan
    Russ, Michael
    Fleming, Dennis
    Spalding, Joshua
    IEEE POWER & ENERGY MAGAZINE, 2023, 21 (02): : 40 - 50
  • [42] Deriving Transformer Equivalent Age for Power System Reliability Assessment from Asset Condition Score
    Awadallah, Selma K. E.
    Milanovic, Jovica
    Jarman, Paul
    2020 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2020,
  • [43] Application of FTA and Improved FAHP in Power Transformer Risk Assessment
    Sun, Yiyun
    Wang, Xin
    Zheng, Yihui
    Li, Lixue
    Xu, Qingshan
    ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 2157 - +
  • [44] Risk Assessment of Power Transformer Based on Failure Rate Optimization
    Chen, Xueran
    Lin, Zhihong
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON SPORTS MEDICINE AND SPORTS MANAGEMENT (SMSM 2013), VOL 1, 2013, 1 : 295 - 300
  • [45] Risk Assessment of Power Transformer in Thailand's Distribution Grid
    Suwanasri, Thanapong
    Kumpalavalee, Suphon
    Suwanasri, Cattareeya
    PROCEEDINGS OF THE 21ST INTERNATIONAL SYMPOSIUM ON HIGH VOLTAGE ENGINEERING, VOL 1, 2020, 598 : 184 - 196
  • [46] Development of Combined Asset Health Index for Asset Management System
    Ko M.-S.
    Kwon H.-H.
    Lee J.-H.
    Jeon S.-D.
    Kim Y.-H.
    Transactions of the Korean Institute of Electrical Engineers, 2024, 73 (04): : 700 - 710
  • [47] Power distribution asset management
    Tor, Osman
    Shahidehpour, Mohammad
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 2472 - 2478
  • [48] Risk assessment methods applied to electricity distribution system asset management
    Nordgard, D. E.
    Sand, K.
    Wangensteen, I.
    RELIABILITY, RISK AND SAFETY: THEORY AND APPLICATIONS VOLS 1-3, 2010, : 429 - 436
  • [49] Effectiveness Assessment Survey of the Spanish Risk Management Plan for Lenalidomide
    Brum, L.
    Laplaza, D.
    Kaehler, S. T.
    Freeman, J.
    Bwire, R.
    DRUG SAFETY, 2011, 34 (10) : 904 - 905
  • [50] Risk assessment management and emergency plan for uranium tailings pond
    Chen, Yifan
    Hong, Yang
    Huang, Danxia
    Dai, Xingwang
    Zhang, Min
    Liu, Yong
    Xu, Zhenghua
    JOURNAL OF RADIATION RESEARCH AND APPLIED SCIENCES, 2022, 15 (03) : 83 - 90