Network-based two-stage robust scheduling strategy for the aircraft assembly system with uncertain duration

被引:1
|
作者
Hu, Jin-Hua [1 ]
Zhu, Ji-Yue [1 ]
Sun, Yan-Ning [2 ]
Chen, Yu [1 ]
Qin, Wei [1 ,3 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
[2] Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai 200444, Peoples R China
[3] Shanghai Jiao Tong Univ, Inst Artificial Intelligence, Shanghai 200240, Peoples R China
关键词
Dynamic scheduling; Complex network; Key job identification; Two -stage scheduling; Uncertain duration; GENETIC ALGORITHM; PROJECT; MANAGEMENT; EFFICIENCY; SERVICE; DEMAND;
D O I
10.1016/j.cie.2024.109911
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Improving the flexibility and robustness of scheduling strategies is crucial for timely delivery of aircraft in dynamic environments. However, with the large scale and frequent disturbances of aircraft assembly operations, conventional dynamic scheduling methods face more difficulty in solving the aircraft assembly scheduling problem with duration uncertainty, especially in analyzing the job duration error transfer characteristics and achieving inverse scheduling optimization. Therefore, this paper proposes an efficient network-based two-stage robust scheduling strategy. Firstly, with the help of network theory, we study the heuristic information about global propagation characteristics of job duration fluctuation and identify the key jobs with high influence of duration error diffusion. Secondly, the dynamic scheduling of aircraft assembly is transformed into a two-stage scheduling with resource-constrained project scheduling and inverse scheduling with resource reallocation for flexible durations. The network-based two-stage robust scheduling strategy achieves scheduling jobs to comply with precedence and resource constraints based on an improved genetic algorithm in the first stage, and the inverse optimization of resource reallocation based on network-based hybrid non-dominated sorting genetic algorithm-II after disturbances in the second stage. Finally, the effectiveness of the strategy is verified on the benchmark from the project scheduling problem library and aircraft assembly data. The experiments show a significant improvement in the performance of key job identification and scheduling in aircraft assembly. Our study provides an efficient scheduling solution for implementing complex aircraft assembly systems with uncertain durations.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] A discrete PSO for two-stage assembly scheduling problem
    Ye Tian
    Dayou Liu
    Donghui Yuan
    Kunhao Wang
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 66 : 481 - 499
  • [22] Positioning error guarantee method with two-stage compensation strategy for aircraft flexible assembly tooling
    Guo, Feiyan
    Liu, Jianhua
    Wang, Zhongqi
    Zou, Fang
    Zhao, Xudong
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2020, 55 : 285 - 301
  • [23] Two-stage robust optimal scheduling of cooperative microgrids based on expected scenarios
    Sang, Bo
    Zhang, Tao
    Liu, Yajie
    Liu, Lingshun
    Shi, Zhichao
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (26) : 6741 - 6753
  • [24] Two-stage robust optimal scheduling with price-based demand response
    Li, Jiaxing
    Dong, Ping
    Liu, Mingbo
    Ke, Siwei
    Wang, Chunling
    Ma, Mingyu
    Huang, Shanchao
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2024, 232
  • [25] Network-Based Robust Hα Stabilization of Uncertain Systems
    Farnam, Arash
    Esfanjani, Reza Mahboobi
    [J]. 2013 21ST IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE), 2013,
  • [26] Two-Stage Robust Unit Commitment with Uncertain Demand Response
    Cho, Youngchae
    Ishizaki, Takayuki
    Imura, Jun-ichi
    [J]. 2021 EUROPEAN CONTROL CONFERENCE (ECC), 2021, : 2104 - 2109
  • [27] Robust two-stage optimization consensus models with uncertain costs
    Li, Huanhuan
    Ji, Ying
    Ding, Jieyu
    Qu, Shaojian
    Zhang, Huijie
    Li, Yuanming
    Liu, Yubing
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 317 (03) : 977 - 1002
  • [28] Two-Stage Stochastic Programming Based on Particle Swarm Optimization for Aircraft Sequencing and Scheduling
    Hong, Youkyung
    Choi, Byunghun
    Kim, Youdan
    [J]. IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2019, 20 (04) : 1365 - 1377
  • [29] Pre-Perturbation Operational Strategy Scheduling in Microgrids by Two-Stage Adjustable Robust Optimization
    Mansouri, Milad
    Eskandari, Mohsen
    Asadi, Yousef
    Siano, Pierluigi
    Alhelou, Hassan Haes
    [J]. IEEE ACCESS, 2022, 10 : 74655 - 74670
  • [30] A better approximation for the two-stage assembly scheduling problem with two machines at the first stage
    Karuno, Y
    Nagamochi, H
    [J]. ALGORITHMS AND COMPUTATION, PROCEEDINGS, 2002, 2518 : 199 - 210