Distributionally robust chance-constrained programming for multi-period emergency resource allocation and vehicle routing in disaster response operations 

被引:14
|
作者
Wang, Weiqiao [1 ]
Yang, Kai [1 ,2 ]
Yang, Lixing [1 ,2 ]
Gao, Ziyou [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Syst Sci, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
关键词
Multi-period resource allocation; Vehicle routing; Distributionally robust optimization; Heuristics; Risk-based ambiguity set; FACILITY LOCATION; OPTIMIZATION; LOGISTICS; MODEL; DEMAND; TIME; UNCERTAINTIES;
D O I
10.1016/j.omega.2023.102915
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Emergency resource allocation and vehicle routing are the most essential and inseparable response actions in emergency management after disasters. In particular, disaster response operations are significantly affected by high uncertainty and incomplete dynamic information of demand and risk. For this purpose, we construct a risk-based ambiguity set for modeling the distributional uncertainty in the demand and describing the coupling relationship between the demand and risk in different periods (e.g., secondary disasters strike). Against this background, we present two distributionally robust chance constrained programming (DRCCP) models with both individual and joint chance constraints for multi period emergency resource allocation and vehicle routing problem under demand distributional ambiguity. For DRCCP with individual chance constraint, we can derive the computationally tractable reformulation of the proposed model with a safe approximation index. For DRCCP with joint chance constraint, we can use Bonferroni's approximation to obtain a set of tractable individual chance constraints. As for the solution method, we first decompose the original model into the emergency resource allocation and vehicle routing subproblems, and then develop an efficient adaptive large neighborhood search (ALNS) algorithm. We evaluate the performance of the proposed ALNS heuristic algorithm on a hypothetical instance set and show that the ALNS algorithm is capable of producing high-quality solutions within a reasonable computing time. We also conduct a real case study of the Wenchuan earthquake in China to demonstrate the superiority of the proposed DRCCP approach in a comparative perspective. In addition, we provide some possible extensions of the considered problem. Finally, we explore the managerial insights that may be useful for the disaster response operation.& COPY; 2023 Elsevier Ltd. All rights reserved.
引用
收藏
页数:26
相关论文
共 50 条
  • [41] A robust possibilistic programming approach to multi-period location-allocation of organ transplant centers under uncertainty
    Zahiri, Behzad
    Tavakkoli-Moghaddam, Reza
    Pishvaee, Mir Saman
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 74 : 139 - 148
  • [42] A robust simulation-optimization approach for pre-disaster multi-period location-allocation-inventory planning
    Ghasemi, Peiman
    Khalili-Damghani, Kaveh
    MATHEMATICS AND COMPUTERS IN SIMULATION, 2021, 179 : 69 - 95
  • [43] Multi-period Shelter Location-Allocation Problem with Network and Location Vulnerabilities for the Response Phase of Disaster Management
    Hansuwa, Sweety
    Mohan, Usha
    Ganesan, Viswanath Kumar
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: SMART MANUFACTURING AND LOGISTICS SYSTEMS: TURNING IDEAS INTO ACTION, APMS 2022, PT I, 2022, 663 : 510 - 517
  • [44] A Multi-Period Vehicle Routing Problem for Emergency Perishable Materials under Uncertain Demand Based on an Improved Whale Optimization Algorithm
    Li, Xiaodong
    Xu, Yang
    Lai, Kin Keung
    Ji, Hao
    Xu, Yaning
    Li, Jia
    MATHEMATICS, 2022, 10 (17)
  • [45] Sustainable regional water allocation under water-energy nexus: A chance-constrained possibilistic mean-variance multi-objective programming
    Wu, Hui
    Yue, Qiong
    Guo, Ping
    Pan, Qi
    Guo, Shanshan
    JOURNAL OF CLEANER PRODUCTION, 2021, 313
  • [46] The interval copula-measure Me based multi-objective multi-stage stochastic chance-constrained programming for seasonal water resources allocation under uncertainty
    Youzhi Wang
    Ping Guo
    Stochastic Environmental Research and Risk Assessment, 2021, 35 : 1463 - 1480
  • [47] The interval copula-measure Me based multi-objective multi-stage stochastic chance-constrained programming for seasonal water resources allocation under uncertainty
    Wang, Youzhi
    Guo, Ping
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2021, 35 (07) : 1463 - 1480
  • [48] Integrated multi-objective chance-constrained fuzzy interval linear programming model with principal component analysis for optimizing agricultural water resource management under uncertainties
    Yin, Ruoyu
    Jin, Lei
    Fu, Haiyan
    Fan, Yurui
    Zhang, Xi
    Wang, Li
    Water Supply, 2024, 24 (07) : 2427 - 2450
  • [49] A joint chance constrained optimization algorithm with robust reconstruction for multi-echelon and multi-period closed-loop manufacturing adjustable system design under multi-source uncertainty
    Lu, Shan
    Wei, Dongyuan
    Wang, Yue
    Li, Xinchao
    Li, Zhe
    JOURNAL OF CLEANER PRODUCTION, 2023, 410
  • [50] A robust possibilistic multi-echelon multi-product multi-period production-inventory-routing problem considering internal operations of cross-docks: Case study of FMCG supply chain
    Jeshvaghani, Mina Dehghani
    Amiri, Maghsoud
    Khalili-Damghani, Kaveh
    Olfat, Laya
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 179