Study on small coal pillar in gob-side entry driving and control technology of the surrounding rock in a high-stress roadway

被引:7
|
作者
Wang, Wen [1 ,2 ]
Wu, Yiheng [1 ]
Lu, Xiaowei [3 ,4 ]
Zhang, Guangjie [1 ,4 ]
机构
[1] Henan Polytech Univ, Sch Energy Sci & Engn, Jiaozuo, Peoples R China
[2] Collaborat Innovat Ctr Coal Work Safety & Clean Hi, Jiaozuo, Peoples R China
[3] China Univ Min & Technol, Sch Safety Engn, Xuzhou, Peoples R China
[4] Henan Polytech Univ, Ind Technol Res Inst, Jiaozuo, Peoples R China
关键词
high stress; gob-side entry driving; surrounding rock control; roadway support; roadway monitoring;
D O I
10.3389/feart.2022.1020866
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The technology described as gob-side entry driving was adopted in the Zhaogu No. 1 mine to resolve the issues pertinent to mining succession tension, serious roadway deformation, and support difficulties. The key parameters of coal columns must be studied to ensure the stable support effect of along-air tunneling under high stress. A calculation for the vertical stress of a coal pillar is proposed, and the location of the breaking line in the top plate in the hollowed mining zone is determined by considering the breakage attributes of the basic uppermost large structure of the key layer, combined with the internal and external stress fields, and the limit equilibrium zone theories. FLAC3D software is employed to simulate the geological requirements of the mine, the characteristics of vertical stress of the coal pillar, and the surrounding rock of the roadway under the technical plan of leaving a 4.5-m coal pillar. The software is also used to verify and analyze the actual measurements. The outcomes suggest that the basic roof break is located at 2.65 m on the side of the coal pillar in the near mining area, and there is a trapezoidal internal stability region around the coal pillar that can provide lasting and stable support of the roadway. The displacement of the two helpers of the roadway is between 100 and 500 mm, and the displacements of the top and bottom plates are less than 300 mm, which ensures the roadway is surrounded by rock when the high-stress requirements occur. The safety of the roadway is determined under high-stress conditions.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Stress Analysis of Negative Coal Pillar Gob-Side Entry and Its Principle of Preventing Rock Burst
    Wang, Zhiqiang
    Wang, Peng
    Shi, Lei
    Lv, Wenyu
    Wu, Chao
    Luo, Jianqiao
    [J]. SHOCK AND VIBRATION, 2020, 2020
  • [32] Deformation and failure characteristics and control technology of surrounding rocks in deeply gob-side entry driving
    Cheng, Lixing
    Kang, Hongpu
    Jiang, Pengfei
    Li, Wenzhou
    Yang, Jianwei
    Zheng, Yangfa
    Yi, Kang
    [J]. Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2021, 38 (02): : 227 - 236
  • [33] Width Design of Small Coal Pillar of Gob-Side Entry Driving in Soft Rock Working Face and Its Application of Zaoquan Coal Mine
    Chen, Ai
    [J]. ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [34] Research on Surrounding Rock Control Technology of Gob-Side Entry Retaining by Directional Roof Cutting in a Deep Coal Mine
    Haojie Xue
    Shibao Shen
    Haoran Lu
    Renbao Zhao
    Peishuai Li
    Yawei Zhao
    Qibin Jiang
    Longjiang Wang
    Beizhan Fan
    Tao Qin
    [J]. Geotechnical and Geological Engineering, 2022, 40 : 2117 - 2125
  • [35] Research on the Surrounding Rock Control Technology of Gob-Side Entry with a Narrow Coal Pillar Reserved in a Fully Mechanized Caving Face with Large Mining Height
    Yi Wang
    Yingming Li
    Zhonglin Yu
    Hao Zhang
    Dan Ding
    [J]. Geotechnical and Geological Engineering, 2022, 40 : 285 - 300
  • [36] Mechanism of roof cutting and pressure relief in gob-side and high-stress roadway in deep coal mine
    深井临空高应力巷道切顶卸压机理研究
    [J]. 1600, China University of Mining and Technology (37): : 1104 - 1113
  • [37] Coal Pillar Stress Weakening Technology and Application by Gob-Side Entry Driving and Hydraulic Roof Cutting in Deep Shafts Mines
    Zhang, Zhi
    Ning, Jianguo
    Wang, Jun
    Wang, Kun
    Yang, Shang
    Yan, Ruyu
    Sun, Guoqing
    Du, Minghao
    [J]. PROCESSES, 2022, 10 (05)
  • [38] Research on Surrounding Rock Control Technology of Gob-Side Entry Retaining by Directional Roof Cutting in a Deep Coal Mine
    Xue, Haojie
    Shen, Shibao
    Lu, Haoran
    Zhao, Renbao
    Li, Peishuai
    Zhao, Yawei
    Jiang, Qibin
    Wang, Longjiang
    Fan, Beizhan
    Qin, Tao
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (04) : 2117 - 2125
  • [39] Investigation of stress of surrounding rock mass of gob-side entry under gob of a longwall panel
    Wang Peng-fei
    Feng Guo-rui
    Zhao Jing-li
    Chugh, Yoginder P.
    Wang Zhi-qiang
    [J]. ROCK AND SOIL MECHANICS, 2018, 39 (09) : 3395 - 3405
  • [40] Study on optimization of coal pillar width of gob-side entry driving in thick coal seam with gas outburst
    Zhou, Lijie
    Chen, Liang
    Cheng, Zhiheng
    Ai, Guo
    Kong, Dezhong
    Wang, Lei
    Wang, Hongbing
    Guo, Kai
    [J]. Meitan Kexue Jishu/Coal Science and Technology (Peking), 2022, 50 (03): : 92 - 101