Assessing Factors Affecting Construction Equipment Productivity Using Structural Equation Modeling

被引:5
|
作者
Chandra, Sathvik Sharath [1 ]
Sepasgozar, Samad M. E. [2 ]
Kumar, Varadhiyagounder Ranganathan Prasath [1 ]
Singh, Atul Kumar [1 ]
Krishnaraj, Loganathan [1 ]
Awuzie, Bankole Osita [3 ]
机构
[1] SRM Inst Sci & Technol, Fac Engn & Technol, Dept Civil Engn, Kattankulathur 603203, Tamil Nadu, India
[2] Univ New South Wales, Sch Built Environm, Sydney, NSW 2052, Australia
[3] Univ Witwatersrand, Sch Construct Econ & Management, Jan Smuts Ave, ZA-2050 Johannesburg, South Africa
关键词
construction equipment; productivity; construction projects; structural equation model; exploratory factor analysis; PLS-SEM; PERFORMANCE; PROJECTS; IMPACTS; DELAY; LABOR;
D O I
10.3390/buildings13020502
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The performance of the construction industry can be improved by understanding the factors that affect the productivity of its equipment. A hypothetical framework was used to analyze six vital construction equipment parameters to understand how they affect productivity in construction projects. Data collected through a survey of 110 respondents in the construction industry were analyzed using an exploratory factor analysis (EFA) and structural equation modeling (SEM). The final model obtained using SEM consisted of 31 attributes from six construction equipment productivity factors, namely management (MG), materials (MT), human (HM), technical (TN), environmental (EM), and other factors (OT). Construction equipment productivity was found to be significantly influenced by MT and OT in construction projects. This was mainly because of their corresponding subfactors, such as operating life and equipment age, and the occurrence of accidents during construction. Consequently, based on survey feedback from various construction professionals, present gaps in construction equipment productivity were analyzed, and recommendations were made to overcome the main limiting factors under MT and OT. This study identified and quantified the interrelationships between various construction equipment productivity constraints. Therefore, the results can help experts and specialists better comprehend how to overcome delays due to idle time and improve construction equipment productivity.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Analysis of Factors Affecting the Quality of Precast Components Based on Structural Equation Modeling
    Xia, Manman
    Zhao, Li
    Qiao, Yaning
    Yuan, Zhenmin
    Cui, Yuanlong
    Zhao, Lemeng
    Li, Julei
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (04) : 4171 - 4185
  • [42] EXAMINING THE FACTORS AFFECTING STUDENTS' SCIENCE AND MATHEMATICS ACHIEVEMENT WITH STRUCTURAL EQUATION MODELING
    Ozer, Yesim
    Anil, Duygu
    [J]. HACETTEPE UNIVERSITESI EGITIM FAKULTESI DERGISI-HACETTEPE UNIVERSITY JOURNAL OF EDUCATION, 2011, (41): : 313 - 324
  • [43] Factors affecting personnel performance in retail marketing: An application of Structural Equation Modeling
    Yener, Hueseyin
    Kurt, Mustafa
    [J]. SOCIAL BEHAVIOR AND PERSONALITY, 2008, 36 (03): : 327 - 335
  • [44] Analysis of Factors Affecting the Quality of Precast Components Based on Structural Equation Modeling
    Manman Xia
    Li Zhao
    Yaning Qiao
    Zhenmin Yuan
    Yuanlong Cui
    Lemeng Zhao
    Julei Li
    [J]. Arabian Journal for Science and Engineering, 2022, 47 : 4171 - 4185
  • [45] Factors Affecting Students' Attitude toward Mathematics: A Structural Equation Modeling Approach
    Davadas, Shamila Dewi
    Lay, Yoon Fah
    [J]. EURASIA JOURNAL OF MATHEMATICS SCIENCE AND TECHNOLOGY EDUCATION, 2018, 14 (01) : 517 - 529
  • [46] Modeling the Social Factors Affecting Students' Satisfaction with Online Learning: A Structural Equation Modeling Approach
    Alenezi, Abdulhameed Rakan
    [J]. EDUCATION RESEARCH INTERNATIONAL, 2022, 2022
  • [47] Conceptual Framework Factors Affecting Construction Labour Productivity
    Nurhendi, Revianty Nurmeyliandari
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    [J]. JURNAL KEJURUTERAAN, 2022, 34 (01): : 89 - 99
  • [48] Latent Structures of the Factors Affecting Construction Labor Productivity
    Dai, Jiukun
    Goodrum, Paul M.
    Maloney, William F.
    Srinivasan, Cidambi
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (05): : 397 - 406
  • [49] A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN
    Ghoddousi, Parviz
    Hosseini, Mohammad Reza
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2012, 18 (01) : 99 - 116
  • [50] Construction Craft Workers' Perceptions of the Factors Affecting Their Productivity
    Dai, Jiukun
    Goodrum, Paul M.
    Maloney, William F.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (03) : 217 - 226