共 50 条
- [21] Construction begins on facility to treat runoff from Britannia mine [J]. CIVIL ENGINEERING, 2005, 75 (05): : 16 - 17
- [22] A DEDICATED LIGHT-SOURCE UNDER CONSTRUCTION IN HEFEI, CHINA [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1986, 246 (1-3): : 18 - 20
- [24] CONSTRUCTION BEGINS ON ADVANCED DESIGN NUCLEAR-PLANT [J]. POWER ENGINEERING, 1992, 96 (03) : 50 - 50
- [25] Advanced technology facility construction education [J]. INSTITUTE OF ENVIRONMENTAL SCIENCES AND TECHNOLOGY, 1998 PROCEEDINGS - CONTAMINATION CONTROL, 1998, : 359 - 363
- [26] Advanced developments in semiconductor facility construction [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 299 - 302
- [29] Experimental research on the longitudinal coupling impedance of RF-shielded BPM-bellows assemblies designed for the Hefei Advanced Light Facility [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2022, 1042
- [30] Micro telecom computing architecture.4-based beam position monitor electronics design for storage ring of Hefei advanced light facility [J]. REVIEW OF SCIENTIFIC INSTRUMENTS, 2021, 92 (10):