共 50 条
- [32] A heuristic approach based on time-indexed modelling for scheduling and tool loading in flexible manufacturing systems [J]. The International Journal of Advanced Manufacturing Technology, 2015, 77 : 1269 - 1274
- [33] A heuristic approach based on time-indexed modelling for scheduling and tool loading in flexible manufacturing systems [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (5-8): : 1269 - 1274
- [37] Time-Indexed Parallel Spatial Modulation for Large-scale MIMO Systems with Antenna Grouping [J]. 2021 IEEE 93RD VEHICULAR TECHNOLOGY CONFERENCE (VTC2021-SPRING), 2021,
- [39] An on-line scheduling problem of parallel machines with common maintenance time [J]. Journal of Systems Science and Complexity, 2013, 26 : 201 - 208