Integrating bioelectrochemical system with aerobic bioreactor for organics removal and caustic recovery from alkaline saline wastewater

被引:5
|
作者
Mohottige, Tharanga N. Weerasinghe [1 ,2 ,3 ]
Ginige, Maneesha P. [1 ]
Kaksonen, Anna H. [1 ,4 ,5 ]
Sarukkalige, Ranjan [2 ]
Cheng, Ka Yu [1 ,6 ]
机构
[1] CSIRO Environm, Floreat, WA, Australia
[2] Curtin Univ, Sch Civil & Mech Engn, Bentley, WA, Australia
[3] Western Sydney Univ, Kingswood, NSW, Australia
[4] Curtin Univ, Western Australian Sch Mines Minerals Energy & Che, Bentley, WA, Australia
[5] Univ Western Australia, Sch Engn, Crawley, WA, Australia
[6] Murdoch Univ, Environm & Energy, Murdoch, WA, Australia
关键词
Alkaliphilic; Biodegradation; Bioelectrochemical system; Biofilm; Oxalate; LATERITIC BAUXITES; BAYER; CHEMISTRY;
D O I
10.1016/j.jenvman.2023.117422
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Bioelectrochemical systems (BES) are increasingly being explored as an auxiliary unit process to enhance con-ventional waste treatment processes. This study proposed and validated the application of a dual-chamber bioelectrochemical cell as an add-on unit for an aerobic bioreactor to facilitate reagent-free pH-correction, or-ganics removal and caustic recovery from an alkaline and saline wastewater. The process was continuously fed (hydraulic retention time (HRT) of 6 h) with a saline (25 g NaCl/L) and alkaline (pH 13) influent containing oxalate (25 mM) and acetate (25 mM) as the target organic impurities present in alumina refinery wastewater. Results suggested that the BES concurrently removed the majority of the influent organics and reduced the pH to a suitable range (9-9.5) for the aerobic bioreactor to further remove the residual organics. Compared to the aerobic bioreactor, the BES enabled a faster removal of oxalate (242 +/- 27 vs. 100 +/- 9.5 mg/L.h), whereas similar removal rates (93 +/- 16 vs. 114 +/- 23 mg/L.h, respectively) were recorded for acetate. Increasing catholyte HRT from 6 to 24 h increased the caustic strength from 0.22% to 0.86%. The BES enabled caustic production at an electrical energy demand of 0.47 kWh/kg-caustic, which is a fraction (22%) of the electrical energy requirement for caustic production using conventional chlor-alkali processes. The proposed application of BES holds promise to improve environmental sustainability of industries in managing organic impurities in alkaline and saline waste streams.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Recovery of heavy metals from industrial wastewater using bioelectrochemical system inoculated with novel Castellaniella species
    Amanze, Charles
    Zheng, Xiaoya
    Man, Meilian
    Yu, Zhaojing
    Ai, Chenbing
    Wu, Xiaoyan
    Xiao, Shanshan
    Xia, Mingchen
    Yu, Runlan
    Wu, Xueling
    Shen, Li
    Liu, Yuandong
    Li, Jiaokun
    Dolgor, Erdenechimeg
    Zeng, Weimin
    [J]. ENVIRONMENTAL RESEARCH, 2022, 205
  • [42] Nitrogen and organic matter removal from slaughterhouse wastewater in a lab-scale aerobic fixed-film bioreactor
    Del Pozo, R
    Diez, V
    Salazar, G
    [J]. ENVIRONMENTAL TECHNOLOGY, 2004, 25 (06) : 713 - 721
  • [43] Simultaneous removal of selenite and heavy metals from wastewater and their recovery as nanoparticles using an inverse fluidized bed bioreactor
    Sinharoy, Arindam
    Kumar, Manoj
    Chaudhuri, Rayanee
    Saikia, Sudeshna
    Pakshirajan, Kannan
    [J]. JOURNAL OF CLEANER PRODUCTION, 2022, 376
  • [44] Ammonia recovery from wastewater using a bioelectrochemical membrane-absorbed ammonia system with authigenic acid and base
    Zhang, Zhiqiang
    Wang, Zuobin
    Zhang, Jiao
    Deng, Ruifeng
    Peng, Huaxia
    Guo, Yaqi
    Xiang, Pengyu
    Xia, Siqing
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 296
  • [45] Performance of a novel hybrid membrane bioreactor for treating saline wastewater from mariculture: Assessment of pollutants removal and membrane filtration performance
    Song, Weilong
    Li, Zhipeng
    Ding, Yi
    Liu, Feng
    You, Hong
    Qi, Peishi
    Wang, Fang
    Li, Yizhu
    Jin, Chao
    [J]. CHEMICAL ENGINEERING JOURNAL, 2018, 331 : 695 - 703
  • [46] Start-up of Aerobic Granular Biomass System: Fate of Organics and Nutrients Removal From Anaerobic Effluent
    Rayaz, Mohd
    Khan, Mohd Aamir
    Khan, Abid Ali
    Khatoon, Fehmeeda
    [J]. WASTE AND BIOMASS VALORIZATION, 2024, 15 (02) : 945 - 958
  • [47] Start-up of Aerobic Granular Biomass System: Fate of Organics and Nutrients Removal From Anaerobic Effluent
    Mohd Rayaz
    Mohd Aamir Khan
    Abid Ali Khan
    Fehmeeda Khatoon
    [J]. Waste and Biomass Valorization, 2024, 15 : 945 - 958
  • [48] Removal and recovery of lead from wastewater using an integrated system of adsorption and crystallization
    Minh Trang Hoang
    Tien Duc Pham
    Viet Tu Nguyen
    Manh Khai Nguyen
    Thi Thuy Pham
    Van der Bruggen, Bart
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 213 : 1204 - 1216
  • [49] Integrating electrochemical pretreatment with microalgae treatment for nitrogen and phosphorus removal and resource recovery from swine wastewater
    He, Zhongqi
    Zhou, Xu
    Qu, Luyao
    Jin, Wenbiao
    Li, Xuan
    Liu, Huan
    Wang, Qilin
    [J]. Bioresource Technology, 2024, 414
  • [50] Removal of Organics and Degradation Products from Industrial Wastewater by a Membrane Bioreactor Integrated with Ozone or UV/H2O2 Treatment
    Laera, G.
    Cassano, D.
    Lopez, A.
    Pinto, A.
    Pollice, A.
    Ricco, G.
    Mascolo, G.
    [J]. ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2012, 46 (02) : 1010 - 1018