共 50 条
- [31] Chooseing suitable BIM software for engineering projects based on the fuzzy neural network evaluation model PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3348 - 3351
- [32] USER-DEFINABLE PROCESS-BASED ELECTRONIC DOCUMENT MANAGEMENT SYSTEMS(UPEDMS) FOR URBAN RENEWAL MEGA PROJECTS PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 305 - 313
- [33] Studies on Risk Management of the Urban Infrastructure Projects Based on the PPP Financing Model 2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 1614 - +
- [35] Expert-based Risk Level Assessment Model for Microtunneling Projects 2020 IEEE CONFERENCE ON TECHNOLOGIES FOR SUSTAINABILITY (SUSTECH), 2020,
- [36] A Schedule Risk Assessment Model of Construction Projects Based on Bayesian Network PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 106 - 111
- [39] A conflict-risk assessment model for urban regeneration projects using Fuzzy-FMEA KSCE Journal of Civil Engineering, 2012, 16 : 1093 - 1103