A Constructability Assessment Model Based on BIM in Urban Renewal Projects in Limited Lands

被引:2
|
作者
Faraji, Amir [1 ,2 ]
Arya, Shima Homayoon [1 ]
Ghasemi, Elnaz [3 ]
Soleimani, Hossein [4 ]
Rahnamayiezekavat, Payam [2 ]
机构
[1] Khatam Univ, Fac Architecture, Construct Project Management Dept, Tehran 1991813741, Iran
[2] Western Sydney Univ, Sch Engn Design & Built Environm, Sydney, NSW 2747, Australia
[3] Khatam Univ, Construct Project Management Dept, Tehran 1991813741, Iran
[4] Khatam Univ, Construct & Bldg Management Dept, Tehran 1991813741, Iran
关键词
constructability; building information modelling; urban renewal projects; limited lands; construction; MCDM techniques;
D O I
10.3390/buildings13102599
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
One of the most significant concerns in urban development today is the organization of areas of cities that have become run-down over time. In order to complete previous constructability studies in other fields of construction, the current study evaluates constructability based on BIM, specifically in the context of the Tehran limited land renewal project. The motivation for this study is the current difficulties facing renewal designs for limited lands, and the lack of a quantitative constructability model for urban renewal projects in Iran. This paper aims (1) to discuss the design elements that should be considered in the design phase of urban renewal projects; (2) to identify the factors that may affect constructability; and (3) to propose a framework for assessing urban renewal designs by considering constructability factors using building information modeling (BIM). To meet these needs, this paper investigates constructability factors and their relative importance, considering the design elements that should be acknowledged in limited land renewal, using a multicriteria techniques. Some 28 constructability factors are identified through a literature review, and based on 52 responses received from a questionnaire survey, the factors are ranked using pairwise comparisons of the analytic hierarchy process (AHP). The final constructability factors that are identified through the technique for order preference using the similarity to ideal solution (TOPSIS) method are standard dimensions, safety, simplification of structure, resource intelligence and alignment, and skilled labor availability. The contribution of this research to the body of knowledge is, firstly, the development of constructability factors for measuring the constructability of urban renewal designs, and secondly, the introduction of BIM as a most beneficial tool for assessing the constructability of the proposed designs. In using the constructability assessment framework and identifying the trade-offs between the constructability of renewal projects in the limited areas of urban spaces, design alternatives become more feasible.
引用
收藏
页数:22
相关论文
共 50 条
  • [31] Chooseing suitable BIM software for engineering projects based on the fuzzy neural network evaluation model
    Feng, Jian
    Zhang, Jianping
    Gao, Shunping
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3348 - 3351
  • [32] USER-DEFINABLE PROCESS-BASED ELECTRONIC DOCUMENT MANAGEMENT SYSTEMS(UPEDMS) FOR URBAN RENEWAL MEGA PROJECTS
    Park, Seung-Jin
    Lim, Jae-Bok
    Kim, Ju-Hyung
    Kim, Jae-Jun
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 305 - 313
  • [33] Studies on Risk Management of the Urban Infrastructure Projects Based on the PPP Financing Model
    Chen, Hanli
    Ma, ChaoQun
    Liu, Bo
    Qin, Tao
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 1614 - +
  • [34] Vulnerability assessment of urban waterbodies based on WRASTIC model
    Maheshwari, Smita
    Vyas, Supriya
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2024, 26 (06) : 15803 - 15821
  • [35] Expert-based Risk Level Assessment Model for Microtunneling Projects
    Elwakil, Emad
    Hegab, Mohamed
    2020 IEEE CONFERENCE ON TECHNOLOGIES FOR SUSTAINABILITY (SUSTECH), 2020,
  • [36] A Schedule Risk Assessment Model of Construction Projects Based on Bayesian Network
    Liu Zheng
    Ma Guofeng
    PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 106 - 111
  • [37] A network-based model for the assessment of success in PPP healthcare projects
    Ongel, Begum
    Tanyer, Ali Murat
    Dikmen, Irem
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (08) : 875 - 887
  • [38] A conflict-risk assessment model for urban regeneration projects using Fuzzy-FMEA
    Yu, Jung-Ho
    Lee, Seul-Ki
    KSCE JOURNAL OF CIVIL ENGINEERING, 2012, 16 (07) : 1093 - 1103
  • [39] A conflict-risk assessment model for urban regeneration projects using Fuzzy-FMEA
    Jung-Ho Yu
    Seul-Ki Lee
    KSCE Journal of Civil Engineering, 2012, 16 : 1093 - 1103
  • [40] Dynamic life cycle environmental impact assessment for urban built environment based on BIM and GIS
    Wang, Luqi
    Wu, Zhiming
    Zhang, Wenjie
    Wang, Xiaoxia
    Feng, Weimin
    ENERGY AND BUILDINGS, 2025, 333