共 50 条
- [31] Tight lower bounds by semidefinite relaxations for the discrete lot-sizing and scheduling problem with sequence-dependent changeover costs OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 421 - 426
- [32] A hybrid heuristic solution based on simulated annealing algorithm for energy efficient single machine scheduling problem with sequence dependent setup times JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2021, 36 (01): : 407 - 420
- [35] Energy-Efficient Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 746 - 758
- [36] CONSTRAINT BASED SCHEDULING IN A GENETIC ALGORITHM FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES ICEC 2010: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON EVOLUTIONARY COMPUTATION, 2010, : 137 - 145
- [39] Planning an efficient closed-loop supply chain network: A unified single-phase approach PROCEEDINGS OF THE 2006 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2006, : 362 - 362
- [40] IFF algorithm for the single machine total weighted tardiness scheduling problem with sequence dependent setup times Luo, J.-X., 2012, Systems Engineering Society of China (32):