摘要
The ageing German bridge infrastructure has led to a major need for retrofitting and renewal. In the scope of a renewable usage of resources, the life-cycle- and economic costs have to be factored in alongside the fabrication costs, which has been largely neglected in current designs. Modular composite bridges with integral sheet-pile abutments offer advantages in this respect. Due to a lack of standardized dimensioning rules, however, only parts of this method have been applied in few exceptions. To counteract this, FOSTA research project P1521 aims to establish two concepts for the execution of a quasi-monolithic connection between a precast composite girder and sheet-pile foundations. To allow for as broad of an application as possible a partly-restrained connection for spans up to 25 m and a fully-restrained connection for spans up to 45 m are investigated. Additional to experimental tests, extensive numerical calculations and parametric studies are performed to identify decisive influencing parameters regarding stiffness and load-bearing capacity of the connection detail. The evaluation of the experimental tests shows quite a high load-bearing capacity as well as a good-natured post-failure behaviour of the joint.
引用
收藏
页码:196 / 204
页数:9
相关论文
共 50 条
  • [31] Analysis of cantilever sheet-pile walls in cohesionless soil - Discussion
    Day, RW
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1997, 123 (01) : 82 - 84
  • [32] Earthquake retrofit of highway/railway embankments by sheet-pile walls
    Adalier K.
    Pamuk A.
    Zimmie T.F.
    Geotechnical and Geological Engineering, 2004, 22 (01) : 73 - 88
  • [34] STUDY ON A LIQUEFACTION COUNTERMEASURE FOR FLUME STRUCTURE BY SHEET-PILE WITH DRAIN
    Otsushi, Kazutaka
    Kato, Tomoo
    Hara, Takashi
    Yashima, Atsushi
    Otake, Yu
    Sakanashi, Kazuhiko
    Honda, Ayumi
    GROUND IMPROVEMENT TECHNOLOGIES AND CASE HISTORIES, 2010, : 437 - 443
  • [35] Grip separation during driving of steel sheet-pile into sandy soil
    Miki, Takeshi
    Tateyama, Michiaki
    Suzuki, Nobukazu
    Yanagimoto, Samon
    Zairyo/Journal of the Society of Materials Science, Japan, 1990, 39 (441) : 655 - 660
  • [36] Displacement Calculation Method on Front Wall of Covered Sheet-Pile Wharf
    Gong, Wen-xue
    Wang, Li-yan
    Li, Jinsong
    Wang, Bing-hui
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [37] Study of dynamic response rule of prestressed anchor sheet-pile wall
    Li Zhi-yong
    Deng Zong-wei
    ROCK AND SOIL MECHANICS, 2010, 31 (02) : 645 - 648
  • [38] STATIC ANALYSIS MODEL FOR DOUBLE SHEET-PILE WALL STRUCTURES.
    Ohori, Kouichi
    Takahashi, Kunio
    Kawai, Yutaka
    Shiota, Keisuke
    Journal of geotechnical engineering, 1988, 114 (07): : 810 - 825
  • [39] Experimental and numerical study on an innovative girder-abutment joint in composite bridges with integral abutments
    Liang, Chen
    Liu, Yuqing
    Zhao, Changjun
    Lei, Bo
    Wu, Jieliang
    CONSTRUCTION AND BUILDING MATERIALS, 2018, 186 : 709 - 730
  • [40] Thermal stresses in steel girder bridges with integral abutments
    William, G. W.
    Shoukry, S. N.
    Riad, M. Y.
    BRIDGE STRUCTURES, 2005, 1 (02) : 103 - 119