Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application

被引:1
|
作者
Wang, Jingjing [1 ,2 ]
Liu, Huimin [1 ]
Wang, Zongxi [1 ]
机构
[1] Qingdao Univ Technol, Sch Management Engn, Qingdao 266525, Peoples R China
[2] Qingdao Univ Technol, Ctr Struct Acoust & Machine Fault Diag, Qingdao 266525, Peoples R China
基金
中国国家自然科学基金;
关键词
Stochastic project scheduling; Multi-stage prefabricated building construction; Duration reliability; DEPSO; DIFFERENTIAL EVOLUTION; ACTIVITY DURATIONS; SERIAL METHOD; RESOURCE; MODEL; MAKESPAN;
D O I
10.1007/s12205-023-2164-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigates a project scheduling problem of prefabricated building (PB) construction in an uncertain environment. Different from the traditional scheduling models in PB construction, we consider a complex multi-stage cooperation system including the production, transportation and assembly (PTA) phases. In this system, both activity durations and resource amounts are stochastic variables. By applying the reliability theory to the stochastic scheduling model innovatively, we formulate a duration reliability model to maximize the probability of non-delayed project completion, within the resource constraints. As the proposed model is a non-deterministic polynomial hard (NP-hard) problem, a hybrid meta-heuristic differential evolution particle swarm optimization (DEPSO) algorithm is developed, which is utilized the mutation factor of the differential evolution (DE) algorithm in the framework of the particle swarm optimization (PSO). Finally, a real-life example of a PB construction project is used to explore the performance of the proposed DEPSO algorithm. The result shows that the hybrid algorithm DEPSO can better find the global optimal solution in the multi-dimensional optimization problem.
引用
收藏
页码:2356 / 2371
页数:16
相关论文
共 50 条
  • [1] Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application
    Jingjing Wang
    Huimin Liu
    Zongxi Wang
    KSCE Journal of Civil Engineering, 2023, 27 : 2356 - 2371
  • [2] Application of multi-stage scheduling
    Bongers, Peter M. M.
    Bakker, B. H.
    16TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING AND 9TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2006, 21 : 1917 - 1922
  • [3] Financial optimisation of the scheduling for the multi-stage project
    Klimek, M.
    Lebkowski, P.
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2017, 65 (06) : 899 - 908
  • [4] Dynamic stochastic approximation for multi-stage stochastic optimization
    Guanghui Lan
    Zhiqiang Zhou
    Mathematical Programming, 2021, 187 : 487 - 532
  • [5] Dynamic stochastic approximation for multi-stage stochastic optimization
    Lan, Guanghui
    Zhou, Zhiqiang
    MATHEMATICAL PROGRAMMING, 2021, 187 (1-2) : 487 - 532
  • [6] Multi-stage analysis of reliability of an example masonry construction
    Zieba, J.
    Buda-Ozog, L.
    Skrzypczak, I
    ARCHIVES OF CIVIL ENGINEERING, 2021, 67 (02) : 275 - 292
  • [7] Multi-stage linear programming optimization for pump scheduling
    Puleo, V.
    Morley, M.
    Freni, G.
    Savic, D.
    12TH INTERNATIONAL CONFERENCE ON COMPUTING AND CONTROL FOR THE WATER INDUSTRY, CCWI2013, 2014, 70 : 1378 - 1385
  • [8] OPTIMIZATION OF MULTI-STAGE PRODUCTION SCHEDULING OF AUTOMATED PRODUCTION
    Xu, N.
    Hou, X. Y.
    Jia, N.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2022, 21 (01) : 160 - 171
  • [9] A multi-stage stochastic programming approach in master production scheduling
    Koerpeoglu, Ersin
    Yaman, Hande
    Akturk, M. Selim
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (01) : 166 - 179
  • [10] Multi-stage stochastic optimization of carbon risk management
    Zapletal, Frantisek
    Smid, Martin
    Kozmik, Vaclav
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 201