Analysis of Loose Surrounding Rock Deformation and Slope Stability at Shallow Double-Track Tunnel Portal: A Case Study

被引:4
|
作者
Li, Chenguang [1 ]
Zheng, Huanyu [1 ]
Hu, Zhaojian [2 ]
Liu, Xiaofei [1 ]
Huang, Zhen [2 ]
机构
[1] Guangxi Rd Construct Engn Grp Co Ltd, Nanning 530001, Peoples R China
[2] Guangxi Univ, Sch Civil Engn & Architecture, Key Lab Disaster Prevent & Struct Safety, Nanning 530004, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 08期
关键词
highway tunnel; surrounding rock deformation; stability analysis; eccentric compression; numerical model; case analysis; HOEK-BROWN CRITERION; RISK-ASSESSMENT; MECHANISM; FAILURE; STRENGTH; MASSES; ROUTE; MODEL;
D O I
10.3390/app13085024
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
A low-clearance tunnel portal in the shallow-buried, joint-developed, broken, and loose surrounding rock slope deposit may cause safety issues during construction. In this study, the Guanyin Mountain Tunnel of the Chong-Ai expressway was taken as a case study, and the characteristics of the loose and broken surrounding rocks, their low clearance, and shallow buried bias were comprehensively studied. The three-dimensional numerical model of the Guanyin Mountain tunnel portal section was constructed by the Rhino, AutoCAD, and FLAC 3D software, and the whole construction process of the tunnel portal was simulated. Under the conditions of loose and broken surrounding rocks, the surrounding rock deformation, surface settlement, and slope stability at the portal of the shallow buried tunnel with a small clear distance during the construction of the center diaphragm (CD) method and circular reserved core soil method were studied. The following conclusions are drawn. During the simulated excavation of the tunnel, the maximum surface settlement is 10.74 mm, which meets the requirement of the specification. When the left tunnel is excavated, the surrounding rock deformation of the right arch shoulder should be carefully considered. The maximum deformation value can reach 14.314 mm. After excavation, the deformation rate of the right tunnel is large, and initial support should be installed in time. Since the stratum rock at the portal of the tunnel is strongly weathered, the uplift value of the arch bottom is large and gradually decreases along the axial direction. The tunnel arch bottom and arch foot are plastic areas prone to tensile damage. Therefore, it is imperative to strengthen the inverted arch support of the tunnel in the strongly weathered rock stratum. The excavation sequence of the tunnel portal section adopts the method of excavating the left tunnel first and then excavating the right tunnel, which is more conducive to ensuring the slope stability.
引用
收藏
页数:22
相关论文
共 50 条
  • [21] Discontinuous deformation analysis of super section tunnel surrounding rock stability based on joint distribution simulation
    He, Peng
    Li, Shu-cai
    Li, Li-ping
    Zhang, Qian-qing
    Xu, Fei
    Chen, Yun-juan
    COMPUTERS AND GEOTECHNICS, 2017, 91 : 218 - 229
  • [22] Analysis of surrounding rock stability of mudstone large-deformation tunnel excavated by shield construction method
    Jia, Shanpo
    Chen, Weizhong
    Yu, Hongdan
    Wu, Guojun
    Li, Xiangling
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2007, 26 (SUPPL. 2): : 3897 - 3903
  • [23] Large Deformation Characteristics of Surrounding Rock and Support Technology of Shallow-Buried Soft Rock Roadway: A Case Study
    Zhu, Liu
    Yao, Qiangling
    Xu, Qiang
    Yu, Liqiang
    Qu, Qundi
    APPLIED SCIENCES-BASEL, 2022, 12 (02):
  • [24] Study of the Stability Control of the Rock Surrounding Double-Key Strata Recovery Roadways in Shallow Seams
    Zhu, Cheng
    Yuan, Yong
    Chen, Zhongshun
    Liu, Zhiheng
    Yuan, Chaofeng
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [25] Deformation and Stress Law of Surrounding Rock for a Bifurcated Tunnel with a Super-Large Section: A Case Study
    Wu, Xiaodong
    Li, Yu
    Gong, Min
    Wu, Haojun
    Wu, Yifan
    APPLIED SCIENCES-BASEL, 2023, 13 (23):
  • [26] Stability Analysis of Surrounding Rock of Shallow-buried Subway Tunnel with Small Spacing under Different Working Conditions
    Hongde Wang
    Shitong He
    Geotechnical and Geological Engineering, 2022, 40 : 5065 - 5079
  • [27] Stability Analysis of Surrounding Rock of Shallow-buried Subway Tunnel with Small Spacing under Different Working Conditions
    Wang, Hongde
    He, Shitong
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (10) : 5065 - 5079
  • [28] Comparative study of Sarma's method and the discontinuous deformation analysis for rock slope stability analysis
    Sun, Jianping
    Ning, Youjun
    Zhao, Zhiye
    GEOMECHANICS AND GEOENGINEERING-AN INTERNATIONAL JOURNAL, 2011, 6 (04): : 293 - 302
  • [29] Stability Analysis and Case Study of Shallow Tunnel Using Pipe Roof Support
    Hongju Xiao
    Shunhua Zhou
    Yuyong Sun
    Geotechnical and Geological Engineering, 2019, 37 : 1249 - 1260
  • [30] Stability Analysis and Case Study of Shallow Tunnel Using Pipe Roof Support
    Xiao, Hongju
    Zhou, Shunhua
    Sun, Yuyong
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (03) : 1249 - 1260