Disassembly Process Planning and Its Lines Balancing Prediction

被引:4
|
作者
Aicha, Mahdi [1 ]
Belhadj, Imen [1 ]
Hammadi, Moncef [2 ]
Aifaoui, Nizar [1 ]
机构
[1] Univ Monastir, Natl Engn Sch Monastir, Mech Engn Lab, Av Ibn Eljazzar, Monastir 5019, Tunisia
[2] ISAE SUPMECA, Quartz EA 7393, 3 Rue Fernand Hainaut, F-93400 Saint Ouen, France
关键词
Disassembly process planning; Prediction of production system; Intelligent product controlling; Analytical model;
D O I
10.1007/s40684-023-00522-7
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Design centers and industrial organizations emphasize that process planning is one of the most important pillars that guarantee an efficient production system, as it represents the principal link between design and manufacturing in target of avoiding time and cost wastes. In order to ensure an effective assembly/disassembly process implementation, several parameters have to be properly treated during the planning phase: product data collection and analysis, alignment with customer demand forecast, capacity calculation and equipment/tools planning, in addition to identify layout steps and process setting-up phases. One of the most important procedures that initiate a product remanufacturability and recyclability is disassembly process. That's why it is mandatory to predict the disassembly process planning and predefine it in advance. This research paper proposes an analytical formulation of disassembly process planning prediction: it is a proactive procedure which model need of equipment, layout and line balancing from the early design phase of product. The disassembly process elements are defined with reference to a previously extracted disassembly plans (DP) from literature, and the disassembly process planning prediction is applied on an optimal disassembly plan selected based on two combined indicators which are Quality index (Qi) and timing index (Ti).
引用
收藏
页码:1565 / 1578
页数:14
相关论文
共 50 条
  • [1] Disassembly Process Planning and Its Lines Balancing Prediction
    Mahdi Aicha
    Imen Belhadj
    Moncef Hammadi
    Nizar Aifaoui
    [J]. International Journal of Precision Engineering and Manufacturing-Green Technology, 2023, 10 : 1565 - 1578
  • [2] Planning and balancing of disassembly systems
    Zuelch, Gert
    Schwarz, Rainer
    [J]. LEAN BUSINESS SYSTEMS AND BEYOND, 2008, 257 : 49 - 56
  • [3] Process planning for product disassembly
    Das, SK
    Naik, S
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (06) : 1335 - 1355
  • [4] A genetic algorithm for disassembly process planning
    Kongar, E
    Gupta, SM
    [J]. ENVIRONMENTALLY CONSCIOUS MANUFACTURING II, 2002, 4569 : 54 - 62
  • [5] Modeling and Balancing for Disassembly Lines Considering Workers With Different Efficiencies
    Wang, Kaipu
    Li, Xinyu
    Gao, Liang
    Li, Peigen
    [J]. IEEE TRANSACTIONS ON CYBERNETICS, 2022, 52 (11) : 11758 - 11771
  • [6] Analysis on Factors Impeding the Disassembly Process with Consideration on Automated Disassembly Planning
    Abdullah, Nurhidayu
    Jafar, Fairul Azni
    Maslan, Mohd Nazmin
    [J]. 2ND INTERNATIONAL MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING CONFERENCE, MIMEC2015, 2015, 2 : 191 - 195
  • [7] Information Model for Cooperative Disassembly Process Planning
    Lee, Hanmin
    Park, Seongwhan
    Feng, Shaw C.
    [J]. COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING (CDVE), 2011, 6874 : 121 - 124
  • [8] Balancing disassembly lines under consideration of tool requirements and limited space
    Limere, Veronique
    Popelier, Lisa
    Schmid, Nico A.
    [J]. IFAC PAPERSONLINE, 2021, 54 (01): : 589 - 594
  • [9] Adaptive fuzzy system for disassembly process planning
    Turowski, M
    Tang, Y
    [J]. 2005 IEEE Networking, Sensing and Control Proceedings, 2005, : 141 - 146
  • [10] DISASSEMBLY PROCESS PLANNING TRADEOFFS FOR PRODUCT MAINTENANCE
    Behdad, Sara
    Thurston, Deborah
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, DETC 2010, VOL 6, 2010, : 427 - 434