Field monitoring and analysis of soil deformation of curved steel pipe jacking in Gongbei tunnel

被引:13
|
作者
Zhang, Peng [1 ]
Zhang, Yunlong [1 ]
Ariaratnam, Samuel T. [1 ,2 ]
Ma, Baosong [3 ]
Zeng, Cong [1 ]
Liu, Kaixin [1 ]
机构
[1] China Univ Geosci Wuhan, Fac Engn, 388, Lumo Rd, Wuhan, Hubei, Peoples R China
[2] Arizona State Univ, Sch Sustainable Engn & Built Environm, 660, S Coll Ave, Tempe, AZ USA
[3] Sun Yat Sen Univ, Sch Civil Engn, 135, Xingang Xi Rd, Guangzhou, Guangdong, Peoples R China
关键词
Curved pipe jacking; Field monitoring; Ground deformation; Layered settlement; Lateral deformation; ROOF;
D O I
10.1016/j.tust.2023.105153
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To ascertain the soil deformation law in the construction of curved pipe jacking, ground deformation, layered settlement and lateral deformation of deep soil have been analyzed by field monitoring of soil deformation data in different types of soil in the curved pipe jacking roof of Gongbei tunnel. The results show that the curved pipe jacking induced ground settlement groove curve shows asymmetry. The variation law of ground settlement and deep soil deformation in different soil is consistent, and the mud pressure, excavation face support force and friction resistance have great influence on the deep soil deformation, but the maximum deformation is related to the soil type. Adjacent curved pipe jacking construction will cause the accumulative deformation of surrounding soil, due to the supporting effect of the completed pipe jacking on surrounding soil, the accumulated value of this part of soil is small. The maximum settlement values of single curved pipe jacking are artificially fill > sand layer > mucky soil. during construction of adjacent jacking pipes, the cumulative deformation values are as follows: mucky soil > artificial fill > sand layer, indicating that the deformation of mucky soil is more significant under multiple disturbances. The soil loss caused by relative position of curved pipe jacking and tunnel is the main reason for the ground settlement deviation. The calculated result of modified Peck formula is accordance with measured values, which can be used to predicate the surface deformation caused by curved pipe jacking.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] Design of the Gongbei tunnel using a very large cross-section pipe-roof and soil freezing method
    Liu, Jiguo
    Ma, Baosong
    Cheng, Yong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 72 : 28 - 40
  • [32] Analysis of soil vertical additional loads induced by pipe jacking construction
    School of Environment and Architecture, University of Shanghai for Science and Technology, Shanghai
    200093, China
    不详
    Jiangsu
    221116, China
    不详
    200072, China
    不详
    200002, China
    Rock Soil Mech, (121-128):
  • [33] Large deformation FE analysis of driven steel pipe piles with soil plugging
    Ko, Junyoung
    Jeong, Sangseom
    Lee, Joon Kyu
    COMPUTERS AND GEOTECHNICS, 2016, 71 : 82 - 97
  • [34] Analysis of soil vertical additional loads induced by pipe jacking construction
    Zhang Zhi-guo
    Zhang Meng-xi
    Wang Wei-dong
    ROCK AND SOIL MECHANICS, 2014, 35 : 121 - 128
  • [35] Mechanism Analysis of Settlement and Deformation of Subgrade of Existing Expressway Through Pipe Jacking
    Yingran, Liu
    Fei, Wang
    Yu, Sun
    Xiaoqiang, Wei
    Junqiang, Ling
    Jian, Gong
    Ximing, Qin
    SSRN,
  • [36] Influence of Soil Deformation Caused by Mining on Sewage Pipelines Built Using The Pipe Jacking Method
    Kalisz, Piotr
    Zieba, Magdalena
    STUDIA GEOTECHNICA ET MECHANICA, 2018, 40 (02) : 147 - 153
  • [37] EXPERIMENTAL STUDY ON THE MECHANICAL AND DEFORMATION PROPERTIES OF PIPE AND SOIL IN RECTANGULAR PIPE JACKING CONSTRUCTION WITH CONTROLLABLE CEMENT GROUTING TECHNOLOGY
    Tang, Jun
    Li, Shengcai
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2021, 30 (01): : 147 - 161
  • [38] Shear Stiffness Analysis of F-Socket Joint in Rectangular Pipe Jacking Tunnel
    Xu Y.
    Kang J.
    Zhang C.
    Pang Y.
    Huang Z.
    Zhang X.
    Zhongguo Tiedao Kexue/China Railway Science, 45 (02): : 113 - 122
  • [39] Field test of mechanical properties of large diameter concrete jacking pipe in soft soil
    Liu, Xiang
    Bai, Hai-Mei
    Chen, Xiao-Chen
    Chen, Jin-Jian
    Wang, Jian-Hua
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2014, 48 (11): : 1503 - 1509
  • [40] Study on stability of soil around micro-tunnel construction using slurry pipe-jacking
    Shimada, H
    Sasaoka, T
    Kubota, S
    Matsui, K
    GEOTECHNICAL ENGINEERING MEETING SOCIETY'S NEEDS, VOLS 1 AND 2, PROCEEDINGS, 2001, : 425 - 429