Risk Assessments in Virtual Power Plants with NESCOR Criteria, Practical Application, Advantages and Disadvantages

被引:5
|
作者
Gkoktsis, Georgios [1 ,2 ]
Lauer, Hagen [3 ]
Jaeger, Lukas [1 ,2 ]
机构
[1] Fraunhofer SIT, Darmstadt, Hessen, Germany
[2] ATHENE, Darmstadt, Hessen, Germany
[3] Tech Hsch Mittelhessen, Giessen, Germany
来源
18TH INTERNATIONAL CONFERENCE ON AVAILABILITY, RELIABILITY & SECURITY, ARES 2023 | 2023年
关键词
Cyber Security; Cyber-Resiliency; Risk Assessment; Virtual Power Plants; NESCOR;
D O I
10.1145/3600160.3605179
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Cyber security in the energy sector is paramount to the safe and reliable generation, transmission, and delivery of electrical energy. In the paradigm of the Virtual Power Plant, a structure which aggregates the output of multiple Distributed Energy Resources and connects to the grid as one entity, it is particularly challenging to prioritize those security controls and countermeasures that measurably improve its security posture. Assessing and framing cyber risk is critically important to enable such endeavors. The National Electric Sector Cybersecurity Organization Resource (NESCOR) has published an assessment framework for the energy sector as part of a study on failure scenarios. This paper presents the results of a practical application of this methodology with an adaptation to VPP specifics and illuminates some of the advantages and challenges present in the process.
引用
收藏
页数:23
相关论文
共 50 条
  • [31] Influence of European Market Frameworks on Market Participation and Risk Management of Virtual Power Plants
    Thie, Nicolas
    Vasconcelos, Maria
    Schnettler, Armin
    Kloibhofer, Lukas
    2018 15TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2018,
  • [32] Evaluation of a New Inverse, Globally Convex Treatment Planning System Algorithm for Gamma Knife Radiation Surgery Within a Prospective Trial: Advantages and Disadvantages in Practical Application
    Heinzelmann, Feline
    Budde, Moritz
    Adamietz, Irenaus A.
    Kroeninger, Kevin
    Bostroem, Jan P.
    ADVANCES IN RADIATION ONCOLOGY, 2022, 7 (06)
  • [33] The design of a risk-hedging tool for virtual power plants via robust optimization approach
    Shabanzadeh, Morteza
    Sheikh-El-Eslami, Mohammad-Kazem
    Haghifam, Mahmoud-Reza
    APPLIED ENERGY, 2015, 155 : 766 - 777
  • [34] Risk-constrained stochastic optimal allocation of energy storage system in virtual power plants
    Sadeghian, Omid
    Oshnoei, Arman
    Khezri, Rahmat
    Muyeen, Sm
    JOURNAL OF ENERGY STORAGE, 2020, 31
  • [35] Application of seismic isolation system to nuclear power plants under earthquake risk
    Kim, S.
    Lee, H-P.
    Jo, M-S.
    LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 2097 - 2102
  • [36] A probabilistic seismic risk assessment procedure for nuclear power plants: (II) Application
    Huang, Yin-Nan
    Whittaker, Andrew S.
    Luco, Nicolas
    NUCLEAR ENGINEERING AND DESIGN, 2011, 241 (09) : 3985 - 3995
  • [37] APPLICATION OF FIRE MODELS FOR RISK ANALYSIS IN FRENCH NUCLEAR-POWER PLANTS
    GROUSET, D
    REBUFFAT, D
    VACHON, M
    BRAUNS, P
    FIRE PROTECTION AND FIRE FIGHTING IN NUCLEAR INSTALLATIONS, 1989, : 327 - 337
  • [38] The Combined QSAR-ICE Models: Practical Application in Ecological Risk Assessment and Water Quality Criteria
    He, Jia
    Tang, Zhi
    Zhao, Yuanhui
    Fan, Ming
    Dyer, Scott D.
    Belanger, Scott E.
    Wu, Fengchang
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2017, 51 (16) : 8877 - 8878
  • [39] Aquatic plants: Test species sensitivity and minimum data requirement evaluations for chemical risk assessments and aquatic life criteria development for the USA
    Lewis, Michael
    Thursby, Glen
    ENVIRONMENTAL POLLUTION, 2018, 238 : 270 - 280
  • [40] Risk-Constrained Optimal Energy Management for Virtual Power Plants Considering Correlated Demand Response
    Liang, Zheming
    Alsafasfeh, Qais
    Jin, Tao
    Pourbabak, Hajir
    Su, Wencong
    IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (02) : 1577 - 1587