共 50 条
- [41] Key parameters of gob-side entry retaining automatically formed by roof cutting and blasting in compound roof condition Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2019, 48 (02): : 236 - 246
- [43] Support technology of gob-side entry retaining with thin immediate roof Electronic Journal of Geotechnical Engineering, 2014, 19 (0Y): : 8615 - 8621
- [44] Calculation and analysis of immediate roof subsidence in gob-side entry retaining Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2011, 28 (01): : 34 - 38
- [45] Research on the Simulation of the Roof Fracture about the Gob-side Entry Retaining RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 624 - +
- [46] Support technology of gob-side entry retaining with thin immediate roof Li, Baoyu, 1600, E-Journal of Geotechnical Engineering (19):
- [47] Effect of cutting roof height on the stability of gob-side retaining roadway with roadside support Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2019, 36 (05): : 924 - 931