Project Delivery Systems: The Partnering Concept in Integrated and Non-Integrated Construction Projects

被引:8
|
作者
Sari, Endah Murtiana [1 ]
Irawan, Agustinus Purna [2 ]
Wibowo, Mochamad Agung [3 ]
Siregar, Januar Parlaungan [4 ]
Praja, Arief Kusuma Among [5 ]
机构
[1] Univ Esa Unggul, Fac Engn, Jakarta 11510, Indonesia
[2] Univ Tarumanagara, Fac Engn, Jakarta 11480, Indonesia
[3] Diponegoro Univ, Dept Civil Engn, Semarang 50275, Indonesia
[4] Univ Malaysia Pahang, Fac Mech & Automot Engn Technol, Pekan 26600, Malaysia
[5] Univ Esa Unggul, Fac Econ & Business, Jakarta 11510, Indonesia
关键词
partnering; design-and-build; project delivery system; design bid build; MODEL;
D O I
10.3390/su15010086
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The project delivery system has a large effect in determining the quality of a project. Strategic plans determined by the owner in the project initiation phase must ensure that project performance indicators in the form of cost and quality as well as time are accomplished. A concept of partnering that is well-managed and planned from the initiation phase will determine the quality of the construction project. Increasing the maturity of partnering is needed in order to achieve better project performance indicators. The concept of partnering in integrated and non-integrated projects has a different pattern. This study intends to discuss the concept of partnering and then recommend several key strategies according to the project life cycle. Research this study is quantitative, analyzing secondary data in the form of weekly meetings and project reports with the comparative method and cause-and-effect analysis. The results show that in the phase above 51% of ongoing projects, there is a significant difference in the pattern of partnering between integrated and non-integrated projects. In order to improve deeper partnering, this research reveals several prerequisites that must be met in order to carry out effective partnering in non-integrated projects. This research may benefit owners, contractors, and stakeholders who want to develop their understanding and knowledge of the concepts of partnering and the maturity of partnering, which will be new strategies for developing and improving project delivery systems. This study focuses on a topic from the Sustainable Development Goals (SDGs), specifically partnership for the goal.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] An analysis of non-integrated engineering education
    Sukel, KE
    Guzdial, M
    Realff, M
    Ludovice, P
    Morley, T
    [J]. PROCEEDINGS OF ICLS 2000 INTERNATIONAL CONFERENCE OF THE LEARNING SCIENCES, 2000, : 89 - 90
  • [32] Integrated Project Delivery Implementation Challenges in the Construction Industry
    Kahvandi, Zahra
    Saghatforoush, Ehsan
    ZareRavasan, Ahad
    Preece, Christopher
    [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (08): : 1672 - 1683
  • [33] Modern Construction: Lean Project Delivery and Integrated Practices
    Sacks, Rafael
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2013, 31 (04) : 394 - +
  • [34] PROJECT PARTNERING - RESULTS OF STUDY OF 280 CONSTRUCTION PROJECTS
    LARSON, E
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 30 - 35
  • [35] Partnering on construction projects: A study of the relationship between partnering activities and project success
    Larson, E
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1997, 44 (02) : 188 - 195
  • [36] Integrated hydroxyapatite implant and non-integrated implants in enucleated Asian patients
    Chuah, CT
    Chee, SP
    Fong, KS
    Por, YM
    Choo, CT
    Luu, C
    Seah, LL
    [J]. ANNALS ACADEMY OF MEDICINE SINGAPORE, 2004, 33 (04) : 477 - 483
  • [37] COST OF CAPITAL AND TAXES IN A NON-INTEGRATED TAX SYSTEM AND IN ONE INTEGRATED
    Nino T, Jorge
    Zurita L, Salvador
    Castillo R, Augusto
    [J]. TRIMESTRE ECONOMICO, 2014, 81 (321): : 109 - 132
  • [38] Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery
    Lahdenpera, Pertti
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2012, 30 (01) : 57 - 79
  • [39] An integrated Building Information Modelling, Integrated Project Delivery and Lean Construction Maturity Model
    Rashidian, Sara
    Drogemuller, Robin
    Omrani, Sara
    [J]. ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2024,
  • [40] Integrated versus non-integrated orbital implants for treating anophthalmic sockets
    Schellini, Silvana
    El Dib, Regina
    Silva, Leandro R. E.
    Farat, Joyce G.
    Zhang, Yuqing
    Jorge, Eliane C.
    [J]. COCHRANE DATABASE OF SYSTEMATIC REVIEWS, 2016, (11):