Information visualization method for intelligent construction of prefabricated buildings based on P-ISOMAP algorithm

被引:4
|
作者
Ouyang, Xue [1 ]
Peng, Yizhou [1 ]
Pan, Siyu [2 ]
Ouyang, Ping [3 ]
机构
[1] China Construct Fifth Engn Bur Corp Ltd, Construct Industrializat Div, Changsha 410004, Hunan, Peoples R China
[2] China Construct Fifth Engn Bur Corp Ltd, Informat Management Dept, Changsha 410004, Hunan, Peoples R China
[3] China Construct 5th Engn Bur, Construct Corp Ltd 3, Engn Management Dept, Changsha 410004, Hunan, Peoples R China
关键词
information visualization; intelligent construction; P-ISOMAP algorithm; pefabricated buildings; TECHNOLOGY;
D O I
10.1515/ijeeps-2022-0118
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Prefabricated buildings are assembled from factory prefabricated parts, components, and materials transported to the construction site. Its construction process is often called "building blocks", and the focus is on "prefabrication" and "assembly". This paper aims to study how to analyze and study the intelligent construction of prefabricated buildings based on the P-ISOMAP algorithm, and describe the information visualization. This paper presents the problem of information visualization, which is based on the P-ISOMAP algorithm and BIM technology. Therefore, the concepts and related algorithms of the two are expounded, and the case design and analysis of the information visualization of the intelligent construction of prefabricated buildings are carried out. The experimental results show that in the questionnaire survey, 87.61% hope to visualize architectural-related information, 82.30% of structural information, and 91.15% of model display, all of which are very high. The information visualization of intelligent construction meets the needs of the masses. In addition to guiding the assembly of prefabricated components, informatization is also convenient for manufacturing and quality management. According to the data generated by real-time monitoring during the construction process, the construction period and the construction material plan are controlled. In the completion stage, these data can be directly exported to complete the completion report for completion acceptance.
引用
收藏
页码:73 / 89
页数:17
相关论文
共 50 条
  • [31] An Intelligent Modeling Method for Protecting and Inheriting the Construction Techniques of Wooden Stilt Buildings
    Wu, Jie
    Chi, Feng
    Wei, Yujiao
    Zhao, Ye
    Huang, Shuoyuan
    Xu, Hongtao
    BUILDINGS, 2025, 15 (01)
  • [32] BIM-Based Digital Construction Strategies to Evaluate Carbon Emissions in Green Prefabricated Buildings
    Ullah, Habib
    Zhang, Hong
    Huang, Baolin
    Gong, Yinan
    BUILDINGS, 2024, 14 (06)
  • [33] Safety Risk Assessment of Prefabricated Buildings Hoisting Construction: Based on IHFACS-ISAM-BN
    Wang, Junwu
    Guo, Feng
    Song, Yinghui
    Liu, Yipeng
    Hu, Xuan
    Yuan, Chunbao
    BUILDINGS, 2022, 12 (06)
  • [34] Safety Risk Optimization of Prefabricated Building Construction based on Improved Bat Algorithm
    Chang, Chunguang
    Dai, Binbin
    2022 41ST CHINESE CONTROL CONFERENCE (CCC), 2022, : 2059 - 2064
  • [35] Research on Swarm Intelligence Algorithm Based on Prefabricated Construction Vehicle Routing Problem
    Chen, Xingrui
    Li, Jun-Qing
    Jiang, Yongqin
    Han, Yunqi
    Jiang, Kun
    Lin, Xiaoping
    Duan, Pei-Yong
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT II, 2018, 10955 : 771 - 779
  • [36] Process scheduling for prefabricated construction based on multi-objective optimization algorithm
    Li, Yan
    Wu, Jiajun
    Hao, Yi
    Gao, Yuchen
    Chai, Runqi
    Chai, Senchun
    Zhang, Baihai
    AUTOMATION IN CONSTRUCTION, 2024, 168
  • [37] Integrated application of prefabricated building construction information based on BIM and RFID technology
    Wang, Hui
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2023, 23 (03) : 1265 - 1278
  • [38] Robot vision system based on information visualization algorithm
    Hui Xu
    International Journal of System Assurance Engineering and Management, 2023, 14 : 738 - 747
  • [39] Intelligent Control Method of Hoisting Prefabricated Components Based on Internet-of-Things
    Zhao, Yuhong
    Cao, Cunfa
    Liu, Zhansheng
    Mu, Enyi
    SENSORS, 2021, 21 (03) : 1 - 17
  • [40] Robot vision system based on information visualization algorithm
    Xu, Hui
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2023, 14 (02) : 738 - 747