Stress optimization analysis of long-span concrete-filled steel tube arch bridge based on Midas full-bridge finite element analysis model

被引:1
|
作者
Qi, Lei [1 ]
Zhao, Yangyang [2 ]
机构
[1] Chelbi Engn Consultants Inc, Business Dev Dept, Beijing 100029, Peoples R China
[2] Chelbi Engn Consultants Inc, Survey & Design Dept 2, Beijing 100029, Peoples R China
来源
关键词
CFST; Arch bridge; Arch rib stress; Finite element analysis; Midas; RESIDUAL-STRESS; PIPE;
D O I
10.1007/s43538-023-00158-w
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
CFST is a new building material developed on the basis of steel bars and concrete, which is frequently employed in bridge construction in China. The arch rib is the main stress part CFST arch bridge has a long span, and the safety of the arch rib directly determines the working performance of the whole bridge. Therefore, to better understand the stress of the arch bridge and ensure its safety of the bridge, the research employs the finite element program Midas to establish a long span concrete filled steel tube full bridge model and analyzes axial force, stress, and displacement of arch rib in each construction stage of the arch bridge. The results show that in different construction stages, the axial force on each section increases gradually. The upper and lower edges of the steel pipe are shown as a gradually increasing negative stress. The displacement change between each section is between (2-4) mm. To sum up, the finite element full bridge analysis based on Midas can accurately obtain the stress state of long-span bridges with CFST arcs. By using this technology, data from large-span CFST arch bridges may be efficiently employed in bridge optimum building, improving the load-bearing capabilities of the arch bridge.
引用
收藏
页码:267 / 278
页数:12
相关论文
共 50 条
  • [21] Research on safety assessment of long-span concrete-filled steel tube arch bridge based on fuzzy-neural network
    Liu, Mu-Yu
    Yuan, Wei-Guo
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2004, 17 (04):
  • [22] Application of grey system method in construction control of long-span concrete-filled steel-tube arch bridge
    Chen, Yan-Jiang
    Fu, Yu-Hui
    Sun, Hang
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2007, 39 (04): : 546 - 548
  • [23] Dynamic Response of a Long-Span Concrete-Filled Steel Tube Tied Arch Bridge and the Riding Comfort of Monorail Trains
    Gou, Hongye
    Zhou, Wen
    Yang, Changwei
    Bao, Yi
    Pu, Qianhui
    APPLIED SCIENCES-BASEL, 2018, 8 (04):
  • [24] Arch-Axis Coefficient Optimization of Long-Span Deck-Type Concrete-Filled Steel Tubular Arch Bridge
    Liu, Q. J.
    Wan, S.
    Liu, H. C.
    2017 4TH INTERNATIONAL CONFERENCE ON ADVANCED MATERIALS, MECHANICS AND STRUCTURAL ENGINEERING (4TH AMMSE 2017), 2017, 269
  • [25] Design of Long-Span Concrete-Filled Steel Tubular Rigid Frame Tied Arch Bridge Based on Robustness
    Nie S.-J.
    Wang C.-C.
    Liu Q.
    Yang X.
    Bridge Construction, 2023, 53 : 91 - 97
  • [26] Research on the Key Technology of Suspender Replacement of Long-span Concrete-filled Steel Tubular Arch Bridge
    Wang, Fei
    Journal of Railway Engineering Society, 2021, 38 (12): : 61 - 67
  • [27] Detection method of bearing capacity of long-span concrete-filled steel tubular arch bridge based on grey theory
    Xu B.
    Li C.-X.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (10): : 2360 - 2366
  • [28] Risk Analysis for the Construction Phases of Long-Span CFST Arch Bridge based on finite element analysis
    Zhang Yu-feng
    Sun Guo-fu
    ADVANCED RESEARCH ON AUTOMATION, COMMUNICATION, ARCHITECTONICS AND MATERIALS, PTS 1 AND 2, 2011, 225-226 (1-2): : 823 - +
  • [29] Analysis of Traveling Wave and Combined Site Effect of Long-Span Upper-Bearing Concrete-Filled Steel Tubular Arch Bridge
    Li, Zite
    Wang, Genhui
    Fan, Jiang
    Jian, Yue
    Zhang, Yongliang
    ADVANCES IN CIVIL ENGINEERING, 2024, 2024
  • [30] Construction practice of the concrete-filled steel tube arch bridge
    Wang, DB
    STRUCTURES IN THE NEW MILLENNIUM, 1997, : 499 - 502