Optimizing the inspection schedule for bridge networks

被引:1
|
作者
Abdelkhalek, Sherif [1 ]
Zayed, Tarek [2 ]
机构
[1] Tanta Univ, Struct Engn Dept, Fac Engn, Tanta, Egypt
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Kowloon, Hong Kong, Peoples R China
关键词
bridge inspection routing problem; optimization; genetic algorithm; discrete event simulation; decision support systems; TRAVELING SALESMEN PROBLEM; OPTIMIZATION;
D O I
10.1139/cjce-2022-0348
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Optimizing the inspection route for a bridge network is a paramount factor in reducing inspection duration and cost, particularly for bridges located in a large geographical area. In this respect, this study presents a bridge network inspection planning model. The model aims to minimize the total inspection cost by reducing traveling distance, accommodation cost, wasted time, and inspection crew cost. The model was developed based on themain concept of themultiple traveling salesman problem. In this model, a discrete event simulation engine was built to estimate the inspection duration for each bridge in the network, whereas the genetic algorithm approach was used to optimize the inspection route. Python was used in coding the model steps. Web scraping technique was utilized to develop a geospatial information algorithm dedicated to extracting the actual driving distance between any two points in the inspection route. To tackle the limitations of previous models, the developed model considered several parameters, such as bridge inspection durations that are either shorter or longer than a day shift, variations in the accommodation fees, actual driving distance, minimum workload to assign a new inspection crew, and minimum time to allow starting inspection activities in a new bridge. Considering these parameters make the developed model comprehensive and more accurate. The model was tested against a real bridge network in the IL, USA, and it proved its effectiveness in optimizing the inspection route. The model provides strong guidance for consultants and authorities in charge of bridges in planning the upcoming inspection activities.
引用
收藏
页码:721 / 736
页数:16
相关论文
共 50 条
  • [41] Nondestructive Evaluation Inspection of the Arlington Memorial Bridge Using a Robotic Assisted Bridge Inspection Tool (RABIT™)
    Gucunski, Nenad
    Boone, Shane D.
    Zobel, Rob
    Ghasemi, Hamid
    Parvardeh, Hooman
    Kee, Seong-Hoon
    NONDESTRUCTIVE CHARACTERIZATION FOR COMPOSITE MATERIALS, AEROSPACE ENGINEERING, CIVIL INFRASTRUCTURE, AND HOMELAND SECURITY 2014, 2014, 9063
  • [42] Optimizing wafer inspection sampling strategies
    Nurani, RK
    Akella, R
    Strojwas, AJ
    Wallace, R
    McIntyre, MG
    Shields, J
    Emami, I
    MICRO, 1995, 13 (02): : 32 - 37
  • [43] Photogrammetry applications in routine bridge inspection and historic bridge documentation
    Jauregui, David V.
    Tian, Yuan
    Jiang, Ruinian
    MANAGING AND MAINTAINING HIGHWAY STRUCTURES AND PAVEMENTS, 2006, (1958): : 24 - 32
  • [45] Inspection schedule optimization technique for power distribution facilities
    Yumbe, Yoshiki
    Hasegawa, Takashi
    Proceedings of the IEEE Power Engineering Society Transmission and Distribution Conference, 2012,
  • [46] Optimization of Pavement Inspection Schedule with Traffic Demand Prediction
    Woo, Soomin
    Yeo, Hwasoo
    11TH INTERNATIONAL CONFERENCE OF THE INTERNATIONAL INSTITUTE FOR INFRASTRUCTURE RESILIENCE AND RECONSTRUCTION (I3R2): COMPLEX DISASTERS AND DISASTER RISK MANAGEMENT, 2016, 218 : 95 - 103
  • [47] Optimization of Inspection Schedule for Hidden-Function Systems
    Zou, Xiaoli
    PROCEEDINGS OF THE 2017 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMPUTER AND SOCIETY (EMCS 2017), 2017, 61 : 187 - 190
  • [48] Method for estimating the inspection schedule for potentially hazardous equipment
    M. M. Grunina
    Chemical and Petroleum Engineering, 1999, 35 : 340 - 343
  • [49] A shrunken cyclic inspection schedule for deteriorating production stages
    Rabinowitz, G
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 96 (03) : 493 - 503
  • [50] Track inspection schedule planning with time and safety considerations
    Farhangi, Hadi
    Konur, Dincer
    Long, Suzanna
    Qin, Ruwen
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2020, 16 (03) : 211 - 239