Risk assessment of occupational safety in construction projects using uncertain information

被引:4
|
作者
Karamoozian, Amirhossein [1 ,2 ]
Luo, Cuicui [2 ]
Wu, Desheng [1 ]
机构
[1] Univ Chinese Acad Sci, Sch Econ & Management, Beijing, Peoples R China
[2] Univ Chinese Acad Sci, Int Coll, Beijing, Peoples R China
关键词
Risk assessment; occupational safety; construction projects; uncertain information; INTUITIONISTIC FUZZY-SETS; DECISION-MAKING; HEALTH; DELPHI; AHP; MANAGEMENT; DISTANCES; RANKING; WORKER; MODEL;
D O I
10.1080/10807039.2023.2248266
中图分类号
X176 [生物多样性保护];
学科分类号
090705 ;
摘要
Uncertainties are always involved in construction projects, and most on-site assessments rely on qualitative data to determine the level of risk to which workers are exposed. Furthermore, the majority of legal documents for companies and statistical data are inadequate for risk analysis. This aspect enhances the uncertainty of the worksite circumstances. This research aims to propose a novel approach in a fuzzy environment to consider the uncertainties and interdependencies for the risk assessment of occupational safety in construction projects. Occupational safety risk factors (OSRFs) are identified using an expert panel. An extended decision-making trial and evaluation laboratory (DEMATEL) with interval-valued intuitionistic fuzzy numbers is integrated with the Choquet integral to obtain robust interdependencies between OSRFs. Then, the extended technique for order preference by similarity to the ideal solution (TOPSIS) method with the intuitionistic fuzzy set (IFs) is applied to obtain the priorities of OSRFs. Moreover, an intuitionistic fuzzy weighted average (IFWA) operator is employed to integrate the individual judgments of experts for ranking the degree of importance of OSRFs. Eventually, the sensitivity analysis is conducted and the robustness and validity of results from the suggested approach are verified.
引用
收藏
页码:1134 / 1151
页数:18
相关论文
共 50 条
  • [21] Risk-based safety impact assessment methodology for underground construction projects in Korea
    Seo, J. W.
    Choi, Hyun Ho
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (01) : 72 - 81
  • [22] Developing an Ensemble Predictive Safety Risk Assessment Model: Case of Malaysian Construction Projects
    Sadeghi, Haleh
    Mohandes, Saeed Reza
    Hosseini, M. Reza
    Banihashemi, Saeed
    Mahdiyar, Amir
    Abdullah, Arham
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2020, 17 (22) : 1 - 25
  • [23] Construction Safety Risk Assessment of Large-Sized Deep Drainage Tunnel Projects
    Hu, Kai
    Wang, Junwu
    Wu, Han
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [24] Activity based risk assessment and safety cost estimation for residential building construction projects
    Gurcanli, G. Emre
    Bilir, Senem
    Sevim, Merve
    SAFETY SCIENCE, 2015, 80 : 1 - 12
  • [25] Construction Safety Risk Assessment of Large-Sized Deep Drainage Tunnel Projects
    Hu, Kai
    Wang, Junwu
    Wu, Han
    Wang, Junwu (junwuwang@163.com), 1600, Hindawi Limited (2021):
  • [26] BIM-integrated construction safety risk assessment at the design stage of building projects
    Lu, Ying
    Gong, Peizhen
    Tang, Yuchun
    Sun, Shuqi
    Li, Qiming
    AUTOMATION IN CONSTRUCTION, 2021, 124
  • [27] Blended analysis of occupational safety hazards and digital transformation of risk assessment in construction industries
    Qiu, Changcui
    Li, Xinming
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2023, 50 (03) : 184 - 196
  • [28] Development of a Risk Assessment System for Construction Projects
    Patrinou, A. G.
    Chassiakos, A. P.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [29] Risk assessment methodology for underground construction projects
    Choi, HH
    Cho, HN
    Seo, JW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) : 258 - 272
  • [30] An occupational safety risk analysis method at construction sites using fuzzy sets
    Gurcanli, G. Emre
    Mungen, Ugur
    INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2009, 39 (02) : 371 - 387