Multi-IRS Deployment Optimization for Enhanced Wireless Coverage: A Performance-Cost Trade-off

被引:1
|
作者
Mei, Weidong [1 ,2 ]
Zhang, Rui [2 ,3 ,4 ]
机构
[1] Univ Elect Sci & Technol China, Natl Key Lab Sci & Technol Commun, Chengdu, Peoples R China
[2] Natl Univ Singapore, Dept Elect & Comp Engn, Singapore, Singapore
[3] Chinese Univ Hong Kong, Shenzhen, Peoples R China
[4] Shenzhen Res Inst Big Data, Shenzhen, Peoples R China
关键词
Intelligent reflecting surface (IRS); multi-IRS deployment; wireless coverage; performance-cost trade-off; graph theory; INTELLIGENT; PLACEMENT;
D O I
10.1109/ICC45041.2023.10279454
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
Intelligent reflecting surface (IRS) can be densely deployed in complex environment to create cascaded line-of-sight (LoS) paths between the base station (BS) and multiple users via tunable single/multiple signal reflections, thereby significantly enhancing the BS's coverage performance. To achieve this goal, we present an optimization framework for multi-IRS deployment in this paper and study its efficient design. In particular, we assume that a set of candidate locations for deploying IRSs are given in an area of interest, and show that there exists a fundamental trade-off between maximizing the BS's coverage in the area and minimizing the total cost in multi-IRS deployment design. Specifically, the more IRSs deployed over those candidate locations, the smaller number of IRS reflections on average required for achieving a LoS link between the BS and any user location in the area, which helps reduce the cascaded path loss and thus enhance the communication performance. To optimally characterize this trade-off, we formulate the multi-IRS deployment problem based on graph theory and propose a new successive removal algorithm to efficiently solve this problem by iteratively removing IRSs from the candidate locations while satisfying a given communication performance constraint. Simulation results are provided to show the efficacy of the proposed design approach and algorithm for multi-IRS deployment.
引用
收藏
页码:2056 / 2061
页数:6
相关论文
共 50 条
  • [41] Trade-off between performance and energy consumption in Wireless Sensor Networks
    Martinez, Jose-F.
    Garcia, Ana-B.
    Corredor, Ivan
    Lopez, Lourdes
    Hernandez, Vicente
    Dasilva, Antonio
    SELF-ORGANIZING SYSTEMS, PROCEEDINGS, 2007, 4725 : 264 - 271
  • [42] Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [43] Optimum Node Deployment Policy (ONDP) for WSN: Trade-off Between Maximization of Area Coverage and Lifetime
    Dutta, Subrata
    Giri, Arindam
    Giri, Debasis
    Neogy, Sarmistha
    Dahal, Keshav
    Chen, Wenbing
    WIRELESS PERSONAL COMMUNICATIONS, 2023, 133 (02) : 1055 - 1080
  • [44] Optimum Node Deployment Policy (ONDP) for WSN: Trade-off Between Maximization of Area Coverage and Lifetime
    Subrata Dutta
    Arindam Giri
    Debasis Giri
    Sarmistha Neogy
    Keshav Dahal
    Wenbing Chen
    Wireless Personal Communications, 2023, 133 : 1055 - 1080
  • [45] Trade-off preservation in inverse multi-objective convex optimization
    Chan, Timothy C. Y.
    Lee, Taewoo
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 270 (01) : 25 - 39
  • [46] ESTMATING COST & IMPROVING TRADE-OFF BETWEEN PERFORMANCE AND COST AT THE EARLY DESIGN STAGES
    Saravi, Mohammad
    Newnes, Linda
    Mileham, Tony
    Goh, Yee-Mey
    ICED 09 - THE 17TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, VOL 7: DESIGN FOR X, DESIGN TO X, 2009, : 81 - +
  • [47] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [48] Electric System Cascade Analysis (ESCA): Cost and Efficiency Trade-Off and Optimization
    Ho, Wai Shin
    Hashim, Haslenda
    Rozali, Nor Erniza Mohammad
    Muis, Zarina A.
    Lim, Jeng Shiun
    PRES15: PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2015, 45 : 517 - 522
  • [49] An integrated multi-objective optimization model for solving the construction time-cost trade-off problem
    Koo, Choongwan
    Hong, Taehoon
    Kim, Sangbum
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (03) : 323 - 333
  • [50] Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem
    Yilmaz, Mehmet
    Dede, Tayfun
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,