Compound deferrable options for the valuation of multi-stage infrastructure investment projects

被引:1
|
作者
Huang, Yu-Lin [1 ]
Lin, Tsen-Chin [1 ]
机构
[1] Natl Yang Ming Chiao Tung Univ, Dept Civil Engn, 1001 Univ Rd, Hsinchu 30010, Taiwan
关键词
Real option; option to defer; compound option; project valuation; multi-stage investment; REAL OPTIONS; UNCERTAINTY; IRREVERSIBILITY; FLEXIBILITY; DECISIONS; CONTRACTS;
D O I
10.1080/01446193.2023.2190993
中图分类号
F [经济];
学科分类号
02 ;
摘要
Multi-stage planning is common for expanding infrastructure complexes or networks. Previous real-option studies developed a sequential compound call option (SCCO) for evaluating multi-stage infrastructure investment projects, including evaluating abandonment options during individual pre-scheduled investment stages. In practice, however, investment schedules involve risk and uncertainties forcing investors to change plans, raising an important issue regarding investors having more options at each commencement date. This study introduces a new model, the sequential compound deferrable call option (SCDCO), incorporating deferment options for each fold in an n-fold setting and generalizing the exercise of each deferment option into m(n) periods. A closed-form solution to the valuation of SCDCO is derived accordingly. A real-world case demonstrates that introducing deferment options increases project value, but the marginal benefit of increasing deferment time diminishes. The presence of dedicated assets for the usage of future expansions can also increase project value, but this increase is restricted by deferment options. Furthermore, the investment cost growth with an increase of deferment time rapidly decreases project value and vice versa. Inflation or deflation is therefore important to consider in deferment decisions. Finally, although deferment options only produce limited project value, they have the flexibility to manage risks, changes, and budgetary constraints.
引用
收藏
页码:670 / 686
页数:17
相关论文
共 50 条
  • [31] Risk-Constrained Multi-Stage Wind Power Investment
    Baringo, Luis
    Conejo, Antonio J.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (01) : 401 - 411
  • [32] Risk-Constrained Multi-Stage Wind Power Investment
    Baringo, Luis
    Conejo, Antonio J.
    2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [33] Novel Multi-Stage Stochastic DG Investment Planning with Recourse
    Santos, Sergio F.
    Fitiwi, Desta Zahlay
    Bizuayehu, Abebe Worke
    Shafie-khah, Miadreza
    Asensio, Miguel
    Contreras, Javier
    Pereira Cabrita, Carlos Manuel
    Catalao, Joao P. S.
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2017, 8 (01) : 164 - 178
  • [34] Portfolio optimization for multi-stage capital investment with neural networks
    Zhang, YL
    Hua, Y
    ADVANCES IN NEURAL NETWORKS - ISNN 2004, PT 2, 2004, 3174 : 982 - 987
  • [35] Investigating Wind Generation Investment Indices in Multi-Stage Planning
    Valinejad, Jaber
    Marzband, Mousa
    Busawon, Krishna
    Kyyra, Jorma
    Pouresmaeil, Edris
    2018 5TH INTERNATIONAL SYMPOSIUM ON ENVIRONMENT-FRIENDLY ENERGIES AND APPLICATIONS (EFEA), 2018,
  • [36] Strategic investment decisions in multi-stage contests with heterogeneous players
    Christian Deutscher
    Marco Sahm
    Sandra Schneemann
    Hendrik Sonnabend
    Theory and Decision, 2022, 93 : 281 - 317
  • [37] Strategic investment decisions in multi-stage contests with heterogeneous players
    Deutscher, Christian
    Sahm, Marco
    Schneemann, Sandra
    Sonnabend, Hendrik
    THEORY AND DECISION, 2022, 93 (02) : 281 - 317
  • [38] General model for stage-discharge prediction in multi-stage compound channels
    Chen, Gang
    Zhao, Shaoxi
    Huai, Wenxin
    Gu, Shixiang
    JOURNAL OF HYDRAULIC RESEARCH, 2019, 57 (04) : 517 - 533
  • [39] A novel technique with compound tool for multi-stage metal spinning
    Ragab K. Abdel-Magied
    The International Journal of Advanced Manufacturing Technology, 2015, 79 : 57 - 63
  • [40] A novel technique with compound tool for multi-stage metal spinning
    Abdel-Magied, Ragab K.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 79 (1-4): : 57 - 63