Borehole transient electromagnetic response calculation and experimental study in coal mine tunnels

被引:2
|
作者
Sun, Qidi [1 ]
Ding, Hao [1 ]
Sun, Yong [1 ]
Yi, Xiaofeng [1 ]
机构
[1] Jilin Univ, Coll Instrumentat & Elect Engn, Changchun 130061, Peoples R China
关键词
advanced detection; borehole transient electromagnetic; small rectangular multi-turn loop; inversion;
D O I
10.1088/1361-6501/ad1db2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Water damage seriously threatens the safe production of coal mines, so it is necessary to carry out advanced detection to determine the hydrogeological situation, and the preliminary survey often involves the drilling of on-site drill holes in the tunnel. The use of directional drill holes, combined with advanced geophysical prospecting technology, enables advanced water disaster detection with long distance and high precision and is independent of the tunnel environment influence. The transient electromagnetic method (TEM) is highly sensitive to low-resistivity anomalies and plays a crucial role in water damage detection. To address the size limitation of borehole detection, in this study, a small rectangular multi-turn loop borehole advanced detection method was developed (borehole TEM, BTEM) to detect low-resistivity anomalies within 10 m of the borehole in the radial direction. To satisfy the size requirements for borehole detection and the detection distance, a small rectangular multi-turn loop device with a width of 6 cm and a length of 50 cm was designed. To resolve the issue of self-inductance and mutual inductance enhancement caused by multi-turn coils, a uniform full-space low-resistivity abnormal body model was established using the Ansys Maxwell software, and we analyzed the vertical magnetic field component of the rectangular multi-turn small loop at different time points and the transient electromagnetic response of the different turns. Then, we determined the appropriate parameters for the transmitting and receiving device. The developed method was applied to several different experimental scenarios to obtain the electrical distribution of the anomalous body in front of the device, and the measured data were inverted and interpreted to obtain the apparent resistivity-depth profile. The results demonstrate that the inversion results align well with the actual situation, confirming the effectiveness of the BTEM. This research offers a potential solution for borehole advance detection and provides a solid theoretical foundation for further studies.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Experimental study of small fixed-loop transient electromagnetic method for characterizing water-bearing structures in tunnels
    Kai Cheng
    Maoxin Su
    Yiguo Xue
    Xiaoyin Ma
    Congcong Li
    Environmental Earth Sciences, 2023, 82
  • [42] Research and application of response characteristics of mine transient electromagnetic perspective detection technology
    Li M.
    Jiang Z.
    Liu S.
    Tong X.
    Chen S.
    Gao Z.
    Dai Q.
    Meitan Xuebao/Journal of the China Coal Society, 2024, 49 (04): : 1976 - 1988
  • [43] Research on response of transient electromagnetic field in underground mine with boundary condition of laneway
    Yue, Jian-Hua
    Yang, Hai-Yan
    Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2008, 37 (02): : 152 - 156
  • [45] Response and test of whole space transient electromagnetic field in mine goaf water
    Xue, Yi Guo
    Li, Shu Cai
    Su, Mao Xin
    Li, Hai Yan
    Tian, Hao
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1136 - 1139
  • [46] Small multi-turn coils based on transient electromagnetic method for coal mine detection
    Tang, Hongzhi
    Yang, Haiyan
    Lu, Guangyin
    Chen, Shenen
    Yue, Jianhua
    Zhu, Ziqiang
    JOURNAL OF APPLIED GEOPHYSICS, 2019, 169 : 165 - 173
  • [47] Underground transient electromagnetic real-time imaging system for coal mine water disasters
    Kang, Yueming
    Xu, Yangcheng
    Wang, Yao
    Wu, Yanqing
    Tan, Qingqing
    MEASUREMENT, 2022, 203
  • [48] Experimental Study on the Basic Characteristic of Coal from Songzao Coal Mine in Chongqing
    Li, Dongwei
    Xu, Guojing
    Wang, Lin
    DISASTER ADVANCES, 2012, 5 : 13 - 16
  • [49] A Case Study on the Gas Drainage Optimization Based on the Effective Borehole Spacing in Sima Coal Mine
    Ji, Ming
    Sun, Zhong-guang
    Sun, Wei
    GEOFLUIDS, 2021, 2021
  • [50] Response characteristic of transient electromagnetic to metallic facilities in coal mines and the disposal technology
    School of Resource and Geoscience, China University of Mining and Technology, Xuzhou 221116, China
    Meitan Xuebao, 2008, 12 (1403-1407):