Evaluation of environmental sustainability of the construction and operation phases of man-made lakes; A case study: Chitgar Lake

被引:1
|
作者
Asadollahfardi, Gholamreza [1 ]
Noghani, Salman [2 ]
Panahandeh, Azadeh [1 ]
Samadi, Amirmohsen [1 ]
Asnaashari, Ehsan [3 ]
机构
[1] Kharazmi Univ, Civil Engn Dept, Tehran, Iran
[2] Azad Univ, Elect Ctr Tehran, Tehran, Iran
[3] Nottingham Trent Univ, Construct Management Dept, Nottingham, England
关键词
BEES; Chitgar Lake; CML; IMPACT; life cycle assessment; SimaPro; LIFE-CYCLE ASSESSMENT; IMPACTS;
D O I
10.1002/ep.14160
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Environmental sustainability of the Chitgar Lake construction project in Tehran, Iran, was evaluated by a life cycle assessment (LCA) method in two phases of construction and operation using SimaPro 8.2.3 software. The results of analysis by Centre voor Milieukunde Leiden (CML) and IMPACT methods demonstrated that during the construction and operation (assuming 80 years of operation) phases of the lake 0.102 and 0.141 Mt of CO(2)eq (affects global warming), 0.015 and 0.021 Mt of 1,4-dichlorobenzene (DB)eq (results in toxicity for humans), 657.155 and 807.425 tons of SO(2)eq (leads to acidification), 150.123 and 69.374 tons of PO4-3 eq (causes eutrophication), 1597 and 2265 terajoules of primary energy (damages the resources), 0.1 and 0.138 Mt of CO(2)eq (impacts on climate change), 18205330.45 and 11424387.32 potentially disappeared function (PDF) x m(2) x yr (harms the quality of the ecosystem), and 165.37 and 104.94 disability-adjusted life year (DALY) (threats the human health) are caused, respectively. Electricity consumption has the greatest environmental impact on the operation phase of the lake. Furthermore, the operation phase of the lake is more harmful to the environment and human health compared to the construction phase.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Environmental determinants of Great Cormorant (Phalacrocorax carbo) distribution in small man-made waterbodies -: a case study of gravel pits in southwest France
    Santoul, F
    Segura, G
    Mastrorillo, S
    HYDROBIOLOGIA, 2004, 528 (1-3) : 179 - 186
  • [42] Community Valuations of Environmental Quality in Coastal Lakes: Lake Illawarra Case Study
    Hodgkinson, Ann
    Valadkhani, Abbas
    ECONOMIC PAPERS, 2009, 28 (02): : 155 - 168
  • [43] MAN-MADE AND ECOLOGICAL HABITAT FRAGMENTATION - STUDY CASE OF THE VOLCANO RABBIT (ROMEROLAGUS-DIAZI)
    VELAZQUEZ, A
    ZEITSCHRIFT FUR SAUGETIERKUNDE-INTERNATIONAL JOURNAL OF MAMMALIAN BIOLOGY, 1993, 58 (01): : 54 - 61
  • [44] Urban Man-made Disaster Data Acquisition and Spatial Analysis: A Case Study of Shanghai City
    Wen, Jiahong
    Si, Ruijie
    Chen, Ke
    Yin, Zhane
    NEW PERSPECTIVES ON RISK ANALYSIS AND CRISIS RESPONSE, 2009, : 485 - 491
  • [45] The Geomorphological Agent of land price for the formation of the Urban Man-Made Landform: A case study of Chongqing
    Zhou, Tao
    Li, Xiao Long
    Lv, Ping
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 138 - 143
  • [46] Geomorphological process development under the impact of man-made reservoir operation, a case study: Bratsk reservoir, Baikal-Angara hydroengineering system, Russia
    Oksana Mazaeva
    Viktoria Babicheva
    Elena Kozyreva
    Bulletin of Engineering Geology and the Environment, 2019, 78 : 4659 - 4672
  • [47] Geomorphological process development under the impact of man-made reservoir operation, a case study: Bratsk reservoir, Baikal-Angara hydroengineering system, Russia
    Mazaeva, Oksana
    Babicheva, Viktoria
    Kozyreva, Elena
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (07) : 4659 - 4672
  • [48] Environmental Sustainability Assessment of a New Sewage Treatment Plant in China Based on Infrastructure Construction and Operation Phases Emergy Analysis
    Zhang, Junxue
    Ma, Lin
    WATER, 2020, 12 (02)
  • [49] Vulnerability Assessment of the Critical Infrastructure against Man-Made Threats (Case Study: International Civilian Airports)
    Farahani, Gholamreza Jalali
    Kachoee, Mohammad Hassan Ataee
    Kachoee, Mohammad Ali Ataee
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2018, 17 (01): : 136 - 145
  • [50] Calculation of water environmental capacity of large shallow lakes - a case study of Taihu Lake
    Hu, Kaiming
    Wang, Yunyan
    Feng, Bin
    Wu, Dan
    Tong, Yifan
    Zhang, Xiaoqiang
    WATER POLICY, 2020, 22 (02) : 223 - 236