Risk-based methodology to assess bridge condition based on visual inspection

被引:20
|
作者
Bertola, Numa J. [1 ]
Bruehwiler, Eugen [1 ]
机构
[1] Swiss Fed Inst Technol Lausanne EPFL, Sch Architecture Civil & Environm Engn ENAC, Lab Maintenance & Safety Struct MCS, Lausanne, Switzerland
关键词
Bridges; condition evaluations; visual inspection; infrastructure management; concrete structures; risk assessment; damage detection; CIVIL INFRASTRUCTURE; RELIABILITY; MANAGEMENT;
D O I
10.1080/15732479.2021.1959621
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The visual inspection of existing infrastructure is a critical step for asset management, as the detection and quantification of damage must be useful to prioritise maintenance. In Switzerland, main inspections are made every five years for all road bridges. For each bridge, a condition value ranging from 1 to 5 is given. As only element-based degradations are currently taken into account in bridge-condition evaluations, inaccurate assessments of global structural safety are often provided by bridge inspectors. In this paper, a risk-based methodology is introduced to evaluate bridge conditions based on visual-inspection data. Degradation states of bridge elements are coupled with element-failure consequences on the global structural safety in risk analysis to accurately assess the bridge condition. A case study of a strategic road involving sixty bridges is used to assess bridge-condition evaluations using the risk-based methodology based on recent visual inspections. The study reveals that including element-failure consequences in bridge-condition assessments supports more accurate evaluations of the impacts of damage on the global structural safety, leading to more objective decisions on asset management actions. Analyses of four damaged bridges show that inspection reports are often over-pessimistic in terms of structural damage, and this can lead to unnecessary rehabilitation interventions.
引用
收藏
页码:575 / 588
页数:14
相关论文
共 50 条
  • [31] Integrating risk-based inspection into risk management plans
    Conley, M
    PROCESS SAFETY PROGRESS, 2005, 24 (04) : 236 - 243
  • [32] A risk-based inspection planning methodology for integrity management of subsea oil and gas pipelines
    Hameed, Hamad
    Bai, Yong
    Ali, Liaqat
    SHIPS AND OFFSHORE STRUCTURES, 2021, 16 (07) : 687 - 699
  • [33] FDA Seeks Risk-Based Inspection Program
    Wechsler, Jill
    Pharmaceutical Technology, 2003, 27 (11) : 26 - 35
  • [35] RISK-BASED INSPECTION OPTIMIZATION FOR VALVE INSPECTIONS
    Vibien, Patrick M.
    Joyal, David A.
    Oliphant, Ken E.
    Luff, William
    PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 3, 2018,
  • [36] Applying and implementing risk-based inspection programs
    Anderson, SA
    HYDROCARBON PROCESSING, 2002, 81 (01): : 43 - 46
  • [37] Risk-based Inspection Optimization of the Deteriorating System
    Tan Lin
    Gong Shiyu
    Guo Bo
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 1874 - 1878
  • [38] An implementation of risk-based inspection for elevator maintenance
    Seung-Tae Park
    Bo-Suk Yang
    Journal of Mechanical Science and Technology, 2010, 24 : 2367 - 2376
  • [39] USDA rolls out risk-based inspection
    不详
    JAVMA-JOURNAL OF THE AMERICAN VETERINARY MEDICAL ASSOCIATION, 2007, 230 (07): : 982 - 982
  • [40] Risk-Based Optimization of Inspection Planning in Ships
    Bharadwaj, Ujjwal
    Wintle, John
    JOURNAL OF SHIP PRODUCTION AND DESIGN, 2011, 27 (03): : 111 - 117