Techno-economic analysis of electricity generation from household sewage sludge in different regions of Nigeria

被引:2
|
作者
Ogbu, Charles Amarachi [1 ]
Ivanova, Tatiana Alexiou [1 ]
Ewemoje, Temitayo Abayomi [2 ]
Okolie, Chinedu Osita [1 ]
Roubik, Hynek [1 ]
机构
[1] Czech Univ Life Sci Prague, Fac Trop Agrisci, Dept Sustainable Technol, Kamycka 129, Prague 16500, Suchdol, Czech Republic
[2] Univ Ibadan, Fac Technol, Dept Agr & Environm Engn, Ibadan, Nigeria
关键词
Waste-to-energy; Biogas; Financial feasibility; Energy cost; Sustainability; Wastewater; MUNICIPAL SOLID-WASTE; FINANCIAL FEASIBILITY; BIOGAS; GASIFICATION; COMBUSTION;
D O I
10.1016/j.scitotenv.2023.166554
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Waste management has been a chronic environmental challenge in Nigeria, coupled with declining economic performance due to energy crises. This study was designed to estimate electricity potential of sewage sludge to meet the 2030 Renewable Energy target. However, there was a need to fill the gap in data related to wastewater management in Nigeria. The wastewater and sludge generated from households were evaluated based on data on population, access to water, and coverage of sewer networks. Consequently, the technical and economic feasibility of electricity generation was assessed using Anaerobic Digestion (AD)1 and Incineration (INC)2 scenarios. The core results found that North Central had the highest potential for wastewater generation (142.8-403.6 billion litres/yr) and collection (8.3-37.5 billion litres/yr) over 20 years. However, the South East had the highest average sewer collection rate of 9.08 %. The AD technology was the most technically viable, with a maximum generation of 6.8 GWh/yr in the North Central. In comparison, the INC outperformed AD in most of the financial viability indicators considered viz-a-viz: Life Cycle Cost (LCC),3 Net Present Value (NPV),4 Pay Back Period (PBP),5 Internal Rate of Return (IRR),6 Levelized Cost of Energy (LCOE).7 The AD had a higher NPV of 16.3-69.58 million USD and a shorter PBP of about 4 years. The INC had a lower LCC of 0.1-0.34 million USD, LCOE of 0.046-0.094 USD/kWh, and a higher IRR of 19.3-25 %. Additionally, the sensitivity of NPV and INC to changes in economic factors would be noteworthy for investors and policymakers. Ultimately, the choice of technology should reflect the fiscal goal and priorities of a project.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Carbon neutral and techno-economic analysis for sewage treatment plants
    Zhang, Qunli
    Yang, Yixiong
    Zhang, Xinchao
    Liu, Fang
    Wang, Gang
    Environmental Technology and Innovation, 2022, 26
  • [22] Carbon neutral and techno-economic analysis for sewage treatment plants
    Zhang, Qunli
    Yang, Yixiong
    Zhang, Xinchao
    Liu, Fang
    Wang, Gang
    ENVIRONMENTAL TECHNOLOGY & INNOVATION, 2022, 26
  • [23] Techno-economic feasibility study of ammonia recovery from sewage sludge digestate in wastewater treatment plants
    Alrbai, Mohammad
    Al-Dahidi, Sameer
    Shboul, Bashar
    Abusorra, Mosa
    Hayajneh, Hassan
    CLEANER ENVIRONMENTAL SYSTEMS, 2024, 15
  • [24] Stochastic techno-economic analysis of electricity produced from poplar plantations in Indiana
    Jeong, Dawoon
    Tyner, Wallace E.
    Meilan, Richard
    Brown, Tristan R.
    Doering, Otto C.
    RENEWABLE ENERGY, 2020, 149 (149) : 189 - 197
  • [25] Modeling and assessment of the techno-economic analysis of biogas and its potential for the generation of electricity from water hyacinth biomass
    Asante, Enoch
    Asiedu, Nana Yaw
    Sarpong, Samuel
    Agyemang, Emmanuel Okoh
    Ajani, Ibrahim
    Ntiamoah, Augustine
    Adjaottor, Albert Amatey
    Addo, Ahmad
    Journal of Engineering and Applied Science, 2024, 71 (01):
  • [26] TACTICAL TECHNO-ECONOMIC ANALYSIS OF ELECTRICITY GENERATION FROM FOREST, FOSSIL, AND WOOD WASTE FUELS IN A HEATING PLANT
    Palander, Teijo
    Vesa, Lauri
    THERMAL SCIENCE, 2012, 16 (03): : 817 - 826
  • [27] Techno-economic and life cycle assessment of an integrated hydrothermal carbonization system for sewage sludge
    Medina-Martos, Enrique
    Istrate, Ioan-Robert
    Villamil, John A.
    Galvez-Martos, Jose-Luis
    Dufour, Javier
    Mohedano, Angel F.
    JOURNAL OF CLEANER PRODUCTION, 2020, 277
  • [28] Techno-Economic and Environmental Sustainability Assessment of a Sewage Sludge Composting Plant: A Case Study
    Albtoosh, Aleen Fawzi
    Alnsour, Moawiah A.
    Hajar, Husam Abu
    Lagum, Abdelmajeed Adam
    WASTE AND BIOMASS VALORIZATION, 2024, 15 (09) : 5275 - 5292
  • [29] Techno-economic analysis of solar PV electricity generation at the university of environment and sustainable development in Ghana
    Asante, Kwame
    Gyamfi, Samuel
    Amo-Boateng, Mark
    Peprah, Forson
    ENERGY REPORTS, 2024, 11 : 659 - 673
  • [30] Techno-Economic Feasibility Study of Solar PV and Biomass-based Electricity Generation for Rural Household and Farm in Botswana
    Abdulah, M. S.
    Matlokotsi, T.
    Chowdhury, S.
    2016 IEEE PES POWERAFRICA CONFERENCE, 2016, : 67 - 71