A study on overall line efficiency (OLE) centered production line maintenance prioritization considering equipment operational reliability

被引:2
|
作者
Yang, Zhaojun [1 ,2 ]
Li, Jieli [1 ,2 ]
Chen, Chuanhai [1 ,2 ]
He, Jialong [1 ,2 ]
Tian, Hailong [1 ,2 ]
Yu, Lijuan [1 ,2 ]
机构
[1] Minist Educ, Key Lab CNC Equipment Reliabil, Changchun 130022, Jilin, Peoples R China
[2] Jilin Univ, Sch Mech & Aerosp Engn, Ren Min Str 5988, Changchun 130022, Jilin, Peoples R China
基金
中国国家自然科学基金;
关键词
Production line; Maintenance prioritisation; Overall line efficiency; Operational reliability; Surrogate model (SM); Extended Fourier Amplitude Sensitivity Test (EFAST); SENSITIVITY-ANALYSIS; REAL-TIME; IMPROVEMENT; MANAGEMENT; SIMULATION; ALGORITHM;
D O I
10.1007/s00170-021-07547-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Maintenance task prioritization is essential for a production system, especially in the case of limited available resources. In this paper, the overall line efficiency (OLE), which comprehensively evaluates production line productivity and processability, is adopted as the objective to develop maintenance prioritization. An OLE centred maintenance prioritization policy is proposed, which assigns priorities according to the influences of the specific characteristics of equipment operational reliability on OLE. In order to correctly allocate limited maintenance resources to truly critical equipment and achieve good maintenance effect, equipment influences on OLE are analysed from the level of the specific performances of their operational reliability, i.e. equipment mean time between stops (mtbs), mean time to resume from stops (mttr) and buffer size N. Considering the interactions between these parameters, a surrogate model-extended Fourier amplitude sensitivity test (SM-EFAST) process is integrated to accurately and rapidly analyse the total effects of them on OLE. Finally, a case study has been carried out to verify the proposed OLE centred maintenance prioritization method, and higher OLE and lower total maintenance cost were achieved.
引用
收藏
页码:3783 / 3794
页数:12
相关论文
共 50 条
  • [41] Application of reliability-centered maintenance for productivity improvement of open pit mining equipment: Case study of Sungun Copper Mine
    Amin Moniri Morad
    Mohammad Pourgol-Mohammad
    Javad Sattarvand
    [J]. Journal of Central South University, 2014, 21 : 2372 - 2382
  • [42] Study on distribution reliability with parallel and on-site distributed generation considering protection miscoordination and tie line
    Department of Electrical Engineering, University of Tokyo, 7-3-1, Hongo, Bunkyo-ku, Tokyo 113-8656
    不详
    [J]. IEEJ Trans. Power Energy, 2006, 10 (1091-1099):
  • [43] Does the Urban Rail Transit Line Type Affect the Operational Efficiency? A Study Based on the DEA-Tobit Method
    Tian, Zhoumin
    Chen, Xumei
    Yu, Lei
    [J]. CICTP 2022: INTELLIGENT, GREEN, AND CONNECTED TRANSPORTATION, 2022, : 1004 - 1012
  • [44] An improved multi-objective multifactorial evolutionary algorithm for assembly line balancing problem considering regular production and preventive maintenance scenarios
    Tang, Qiuhua
    Meng, Kai
    Cheng, Lixin
    Zhang, Zikai
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2022, 68
  • [45] Measurement value analysis overall equipment effectiveness (OEE) packaging process in line 2 (Case Study of PT. MBI Tbk)
    Rimawan, Erry
    Kholil, Muhammad
    Hendri
    [J]. INTERNATIONAL CONFERENCE AND EXHIBITION IN ADVANCED MATERIALS AND MICROSCOPY 2017 (ICEAMM 2017), 2018, 343
  • [46] An applied study to obtain the highest marking efficiency and a balanced production line of Saudi thobe in a garment factory
    Sheta, Aida Mohamed
    Hejy, Mona Mohamed
    [J]. AEJ - Alexandria Engineering Journal, 2006, 45 (03): : 307 - 315
  • [47] Integrated system reliability and productive capacity analysis of a production line. A case study for a Chilean mining process
    Viveros, P.
    Zio, E.
    Kristjanpoller, F.
    Arata, A.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2012, 226 (O3) : 305 - 317
  • [48] Reliability and maintainability analysis of cheese (feta) production line in a Greek medium-size company: A case study
    Tsarouhas, Panagiotis H.
    Arvanitoyannis, Ioannis S.
    Varzakas, Theodoros H.
    [J]. JOURNAL OF FOOD ENGINEERING, 2009, 94 (3-4) : 233 - 240
  • [49] Valve Control with intelligent Fieldbus Technology instead of Compressed Air Lines to the Control Cabinets Beverage manufacturer Teisseire increased the Reliability and Efficiency of its Production Line
    Van Loon, John
    [J]. ATP EDITION, 2015, (1-2): : 26 - 27
  • [50] A Study on a Design Considering the Transient State of a Line-Start Permanent Magnet Synchronous Motor Satisfying the Requirements of the IE4 Efficiency Class
    Park, Hyun-Jong
    Hong, Hyeon-Bin
    Lee, Ki-Doek
    [J]. ENERGIES, 2022, 15 (24)