共 50 条
- [41] Application of reliability-centered maintenance for productivity improvement of open pit mining equipment: Case study of Sungun Copper Mine [J]. Journal of Central South University, 2014, 21 : 2372 - 2382
- [42] Study on distribution reliability with parallel and on-site distributed generation considering protection miscoordination and tie line [J]. IEEJ Trans. Power Energy, 2006, 10 (1091-1099):
- [43] Does the Urban Rail Transit Line Type Affect the Operational Efficiency? A Study Based on the DEA-Tobit Method [J]. CICTP 2022: INTELLIGENT, GREEN, AND CONNECTED TRANSPORTATION, 2022, : 1004 - 1012
- [45] Measurement value analysis overall equipment effectiveness (OEE) packaging process in line 2 (Case Study of PT. MBI Tbk) [J]. INTERNATIONAL CONFERENCE AND EXHIBITION IN ADVANCED MATERIALS AND MICROSCOPY 2017 (ICEAMM 2017), 2018, 343
- [46] An applied study to obtain the highest marking efficiency and a balanced production line of Saudi thobe in a garment factory [J]. AEJ - Alexandria Engineering Journal, 2006, 45 (03): : 307 - 315