A study on overall line efficiency (OLE) centered production line maintenance prioritization considering equipment operational reliability

被引:2
|
作者
Yang, Zhaojun [1 ,2 ]
Li, Jieli [1 ,2 ]
Chen, Chuanhai [1 ,2 ]
He, Jialong [1 ,2 ]
Tian, Hailong [1 ,2 ]
Yu, Lijuan [1 ,2 ]
机构
[1] Minist Educ, Key Lab CNC Equipment Reliabil, Changchun 130022, Jilin, Peoples R China
[2] Jilin Univ, Sch Mech & Aerosp Engn, Ren Min Str 5988, Changchun 130022, Jilin, Peoples R China
基金
中国国家自然科学基金;
关键词
Production line; Maintenance prioritisation; Overall line efficiency; Operational reliability; Surrogate model (SM); Extended Fourier Amplitude Sensitivity Test (EFAST); SENSITIVITY-ANALYSIS; REAL-TIME; IMPROVEMENT; MANAGEMENT; SIMULATION; ALGORITHM;
D O I
10.1007/s00170-021-07547-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Maintenance task prioritization is essential for a production system, especially in the case of limited available resources. In this paper, the overall line efficiency (OLE), which comprehensively evaluates production line productivity and processability, is adopted as the objective to develop maintenance prioritization. An OLE centred maintenance prioritization policy is proposed, which assigns priorities according to the influences of the specific characteristics of equipment operational reliability on OLE. In order to correctly allocate limited maintenance resources to truly critical equipment and achieve good maintenance effect, equipment influences on OLE are analysed from the level of the specific performances of their operational reliability, i.e. equipment mean time between stops (mtbs), mean time to resume from stops (mttr) and buffer size N. Considering the interactions between these parameters, a surrogate model-extended Fourier amplitude sensitivity test (SM-EFAST) process is integrated to accurately and rapidly analyse the total effects of them on OLE. Finally, a case study has been carried out to verify the proposed OLE centred maintenance prioritization method, and higher OLE and lower total maintenance cost were achieved.
引用
收藏
页码:3783 / 3794
页数:12
相关论文
共 50 条
  • [1] A study on overall line efficiency (OLE) centered production line maintenance prioritization considering equipment operational reliability
    Zhaojun Yang
    Jieli Li
    Chuanhai Chen
    Jialong He
    Hailong Tian
    Lijuan Yu
    [J]. The International Journal of Advanced Manufacturing Technology, 2023, 124 : 3783 - 3794
  • [2] Operational reliability evaluation-based maintenance planning for automotive production line
    Soltanali, Hamzeh
    Rohani, Abbas
    Tabasizadeh, Mohammad
    Abbaspour-Fard, Mohammad Hossein
    Parida, Aditya
    [J]. QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2020, 17 (02): : 186 - 202
  • [3] Study and application of Reliability-centered Maintenance considering Radical Maintenance
    Li, Dacheng
    Gao, Jinji
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2010, 23 (05) : 622 - 629
  • [4] Availability-Oriented Maintenance Strategy of Key Equipment in Automated Production Line Considering Performance Degradation
    Yang, Miao
    Li, Congbo
    Tang, Ying
    Xiong, Maokun
    [J]. IEEE ROBOTICS AND AUTOMATION LETTERS, 2023, 8 (06) : 3182 - 3189
  • [5] MAINTENANCE STRATEGY BASED ON EQUIPMENT RELIABILITY ANALYSIS OF A PULP BALING LINE
    Angeli, Moacyr
    Scalzer, André Frederico
    [J]. O Papel, 2020, 81 (12): : 75 - 85
  • [6] Transmission and Generation Expansion Planning Considering System Reliability and Line Maintenance
    Mahdavi, Meisam
    Macedo, Leonardo H.
    Romero, Ruben
    [J]. 26TH IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE 2018), 2018, : 1005 - 1010
  • [7] Reliability and Economic Effects of Maintenance on TNEP Considering Line Loading and Repair
    Mahdavi, Meisam
    Monsef, Hassan
    Romero, Ruben
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (05) : 3381 - 3393
  • [8] An Improvement Scheme for the Overall Line Effectiveness of a Production Line: A Case Study
    Li, Jieli
    Jia, Yuhui
    Xu, Binbin
    Chen, Fei
    Yang, Zhaojun
    Li, Xiaodong
    [J]. 2018 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2018, : 304 - 309
  • [9] MODELING THE RELIABILITY AND EFFICIENCY OF FLEXIBLE SYNCHRONOUS PRODUCTION LINE
    Swic, Antoni
    Mazurek, Lech
    [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2011, (04): : 41 - 48
  • [10] Modeling the reliability and efficiency of flexible synchronous production line
    Świć, Antoni
    Mazurek, Lech
    [J]. Eksploatacja i Niezawodnosc, 2011, 52 (04) : 41 - 48