A nested partitioning-based solution method for seru scheduling problem with resource allocation

被引:0
|
作者
Zhang, Zhe [1 ]
Izui, Kazuhiro [2 ]
Song, Xiaoling [1 ]
Yin, Yong [3 ]
Gong, Xue [1 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing 210094, Peoples R China
[2] Kyoto Univ, Dept Mech Engn & Sci, Kyoto 6158540, Japan
[3] Doshisha Univ, Grad Sch Business, Karasuma Imadegawa Kamigyo Ku, Kyoto 6028580, Japan
基金
中国国家自然科学基金;
关键词
Seru production system; Scheduling; Combination optimization model; Nested partitioning method; Resource allocation; LINE-CELL CONVERSION; ADDITIONAL RESOURCES; NUMERICAL-ANALYSIS; MODELS;
D O I
10.1016/j.jmse.2023.11.003
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
This paper investigates the production scheduling problems of allocating resources and sequencing jobs in the seru production system (SPS). As a new-type manufacturing mode arising from Japanese production practices, seru production can achieve efficiency, flexibility, and responsiveness simultaneously. The production environment in which a set of jobs must be scheduled over a set of serus according to due date and different execution modes is considered, and a combination optimization model is provided. Motivated by the problem complexity and the characteristics of the proposed seru scheduling model, a nested partitioning method (NPM) is designed as the solution approach. Finally, computational studies are conducted, and the practicability of the proposed seru scheduling model is proven. Moreover, the efficiency of the nested partitioning solution method is demonstrated by the computational results obtained from different scenarios, and the good scalability of the proposed approach is proven via comparative analysis. (c) 2024 China Science Publishing & Media Ltd. Publishing Services by Elsevier B.V. on behalf of KeAi Communications Co. Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
引用
收藏
页码:101 / 114
页数:14
相关论文
共 50 条
  • [21] Slotframe Partitioning-based Cell Scheduling for IEEE 802.15.4 Time Slotted Channel Hopping
    Kwon, Jung-Hyok
    Kim, Eui-Jik
    Kim, Dongwan
    SENSORS AND MATERIALS, 2019, 31 (05) : 1419 - 1427
  • [22] A graph partitioning-based hybrid feature selection method in microarray datasets
    Oubaouzine, Abdelali
    Ouaderhman, Tayeb
    Chamlal, Hasna
    KNOWLEDGE AND INFORMATION SYSTEMS, 2025, 67 (01) : 633 - 660
  • [23] A horizontal partitioning-based method for frequent pattern mining in transport timetable
    Teixeira, Claudio
    Fragoso, Luana
    Mattoso, Marta
    Carvalho, Diego
    Bezerra, Eduardo
    Soares, Jorge
    Amorim, Glauco
    Ogasawara, Eduardo
    EXPERT SYSTEMS, 2022, 39 (02)
  • [24] Graph Partitioning-based Zonal Reserve Allocation for Congestion Management in Power Systems with Wind Resources
    Abedi, Sajjad
    He, Miao
    Giesselmann, Michael
    2016 North American Power Symposium (NAPS), 2016,
  • [25] Policy Based Scheduling for Resource Allocation on Grid
    Cho, Sun-hoon
    Lee, Moo-hun
    In, Jang-uk
    Kim, Bong-hoi
    Choi, Eui-in
    ADVANCES IN WEB AND NETWORK TECHNOLOGIES, AND INFORMATION MANAGEMENT, PROCEEDINGS, 2007, 4537 : 229 - +
  • [26] A Trust- and Cooperation-Based Solution of a Dynamic Resource Allocation Problem
    Anders, Gerrit
    Steghoefer, Jan-Philipp
    Siefert, Florian
    Reif, Wolfgang
    2013 IEEE 7TH INTERNATIONAL CONFERENCE ON SELF-ADAPTIVE AND SELF-ORGANIZING SYSTEMS (SASO), 2013, : 1 - 10
  • [27] Multi-objective scheduling and a resource allocation problem in hospitals
    Jeric, Silvija Vlah
    Figueira, Jose Rui
    JOURNAL OF SCHEDULING, 2012, 15 (05) : 513 - 535
  • [28] Multi-objective scheduling and a resource allocation problem in hospitals
    Silvija Vlah Jerić
    José Rui Figueira
    Journal of Scheduling, 2012, 15 : 513 - 535
  • [29] A SIMHEURISTIC ALGORITHM FOR SOLVING AN INTEGRATED RESOURCE ALLOCATION AND SCHEDULING PROBLEM
    Maccarrone, Ludovica
    Giovannelli, Tommaso
    Ferone, Daniele
    Panadero, Javier
    Juan, Angel A.
    2018 WINTER SIMULATION CONFERENCE (WSC), 2018, : 3340 - 3351
  • [30] GA applied in project resource allocation and leveling scheduling problem
    Luo, SP
    Tang, XZ
    Lin, LF
    Progress in Intelligence Computation & Applications, 2005, : 703 - 708