Project Phase-Based Contingency Adjustment Framework for Infrastructure Renewal Projects

被引:1
|
作者
Shamshiri, Alireza [1 ]
Ryu, Kyeong Rok [1 ]
Park, June Young [1 ]
Choi, Kunhee [2 ]
机构
[1] Univ Texas Arlington, Dept Civil Engn, 416 S Yates St, Arlington, TX 76010 USA
[2] Texas A&M Univ, Dept Construct Sci, 3137 TAMU, College Stn, TX 77843 USA
关键词
Infrastructure; Contingency; Project phases; Path analysis; Cost estimation; COST-OVERRUN; PROBABILISTIC COST; RISK; METHODOLOGY; INDEXES;
D O I
10.1061/JCEMD4.COENG-12311
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Given the importance of accurate contingency estimation to properly absorb cost fluctuations, there have been enormous efforts to identify risk factors and measure contingency in roadway projects. However, no study has proposed a contingency framework that reflects the linkage effects of factors through the project phases. To this end, this research develops a project phase-based contingency adjustment framework using a path analysis drawing on a dataset of 1,053 rehabilitation, reconstruction, and resurfacing (3R) roadway projects in Florida. In particular, our framework incorporates the sequential effects of factors through the lenses of project phases from planning and bidding and contract to construction and completion. The developed path model shows that individual factors may have direct and/or indirect impacts on project costs. The results of this study can be applied to better contingency and cost estimation and proper risk management in the preconstruction phases of roadway renewal projects.
引用
收藏
页数:14
相关论文
共 42 条
  • [21] Framework of RFID-based Infrastructure Project Quality Management Expert System
    Cheng, Haifang
    Zou, Danfeng
    Jiang, Shimiao
    QUANTUM, NANO, MICRO AND INFORMATION TECHNOLOGIES, 2011, 39 : 352 - 358
  • [22] Reimagining and Empowering the Design of Projects: A Project-Based Learning Goals Framework
    Stolk, Jonathan D.
    Martello, Robert
    2018 IEEE FRONTIERS IN EDUCATION CONFERENCE (FIE), 2018,
  • [23] Critical Infrastructure Renewal: A Framework for Fuzzy Logic Based Risk Assessment and Microscopic Traffic Simulation Modelling
    Alam, M. D. Jahedul
    Habib, Muhammad Ahsanul
    Quigley, Kevin
    WORLD CONFERENCE ON TRANSPORT RESEARCH - WCTR 2016, 2017, 25 : 1397 - 1415
  • [24] On Incrementality, overt agreement, theta-roles and Spec,Head relations in the phase-based framework
    Ortega-Santos, Ivan
    EXPLORATIONS OF PHASE THEORY: FEATURES AND ARGUMENTS, 2009, 18 : 87 - 106
  • [25] A 3-D Gabor Phase-Based Coding and Matching Framework for Hyperspectral Imagery Classification
    Jia, Sen
    Shen, Linlin
    Zhu, Jiasong
    Li, Qingquan
    IEEE TRANSACTIONS ON CYBERNETICS, 2018, 48 (04) : 1176 - 1188
  • [26] Phase-based design of CO2 capture, transport, and storage infrastructure via SimCCS3.0
    Ma, Zhiwei
    Chen, Bailian
    Pawar, Rajesh. J. J.
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [27] Phase-based design of CO2 capture, transport, and storage infrastructure via SimCCS3.0
    Zhiwei Ma
    Bailian Chen
    Rajesh J. Pawar
    Scientific Reports, 13
  • [28] A new data mining-based framework to predict the success of private participation in infrastructure projects
    Ayat, Muhammad
    Kim, Byunghoon
    Kang, Chang Wook
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (13) : 2151 - 2159
  • [29] A Conceptual Framework for the Assessment of Project Alternatives in the Front-End Phase of Major Transportation Projects
    Mahmoud, Nahid Vesali
    Bayraktar, Mehmet Emre
    Ozen, Halit
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 1383 - 1392
  • [30] Analysis of the Viability of an Urban Renewal Project under a Risk-Based Option Pricing Framework
    Hui, Eddie Chi-man
    Ng, Ivan Man-hon
    Lo, Kak-keung
    JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2011, 137 (02) : 101 - 111