Project Phase-Based Contingency Adjustment Framework for Infrastructure Renewal Projects

被引:1
|
作者
Shamshiri, Alireza [1 ]
Ryu, Kyeong Rok [1 ]
Park, June Young [1 ]
Choi, Kunhee [2 ]
机构
[1] Univ Texas Arlington, Dept Civil Engn, 416 S Yates St, Arlington, TX 76010 USA
[2] Texas A&M Univ, Dept Construct Sci, 3137 TAMU, College Stn, TX 77843 USA
关键词
Infrastructure; Contingency; Project phases; Path analysis; Cost estimation; COST-OVERRUN; PROBABILISTIC COST; RISK; METHODOLOGY; INDEXES;
D O I
10.1061/JCEMD4.COENG-12311
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Given the importance of accurate contingency estimation to properly absorb cost fluctuations, there have been enormous efforts to identify risk factors and measure contingency in roadway projects. However, no study has proposed a contingency framework that reflects the linkage effects of factors through the project phases. To this end, this research develops a project phase-based contingency adjustment framework using a path analysis drawing on a dataset of 1,053 rehabilitation, reconstruction, and resurfacing (3R) roadway projects in Florida. In particular, our framework incorporates the sequential effects of factors through the lenses of project phases from planning and bidding and contract to construction and completion. The developed path model shows that individual factors may have direct and/or indirect impacts on project costs. The results of this study can be applied to better contingency and cost estimation and proper risk management in the preconstruction phases of roadway renewal projects.
引用
收藏
页数:14
相关论文
共 42 条
  • [1] Investigating implementation level of phase-based strategies in transportation infrastructure projects
    Safapour, Elnaz
    Kermanshachi, Sharareh
    Jafari, Amirhosein
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2022, 49 (05) : 792 - 801
  • [2] Developing a cost normalization framework for phase-based performance assessment of construction projects
    Choi, Jiyong
    Yun, Sungmin
    de Oliveira, Daniel P.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2016, 43 (12) : 1075 - 1086
  • [3] Phase-based externality analysis for large hydropower projects
    Xia, Bingqing
    Qiang, Maoshan
    Jiang, Hanchen
    Wen, Qi
    An, Nan
    Zhang, Dongcheng
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2020, 80
  • [4] A project contingency framework based on uncertainty and its consequences
    Howell, David
    Windahl, Charlotta
    Seidel, Rainer
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (03) : 256 - 264
  • [5] PROMETHEE-Based Framework for Prioritization of Infrastructure Projects
    Woldemariam, W.
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2022: INFRASTRUCTURE SYSTEMS, 2022, : 154 - 165
  • [6] Risk Perception-Based Project Contingency Management Framework
    Ottaviani, Filippo Maria
    De Marco, Alberto
    Rafele, Carlo
    Castelblanco, Gabriel
    SYSTEMS, 2024, 12 (03):
  • [7] Development of performance metrics for phase-based capital project benchmarking
    Yun, Sungmin
    Choi, Jiyong
    de Oliveira, Daniel P.
    Mulva, Stephen P.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (03) : 389 - 402
  • [8] Network Accessibility-Based Framework for Prioritization of Infrastructure Projects
    Woldemariam, W.
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2021: TRANSPORTATION PLANNING AND DEVELOPMENT, 2021, : 201 - 214
  • [9] Conducting Mode 2 research in HRM: A phase-based framework
    Guerci, Marco
    Radaelli, Giovanni
    Shani, Abraham B.
    HUMAN RESOURCE MANAGEMENT, 2019, 58 (01) : 5 - 20
  • [10] A phase-based framework for optical flow estimation on omnidirectional images
    Brahim Alibouch
    Amina Radgui
    Cédric Demonceaux
    Mohammed Rziza
    Driss Aboutajdine
    Signal, Image and Video Processing, 2016, 10 : 285 - 292